My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The COR Land Use Plan(2040 Comp Plan) <br /> • City of Ramsey, Engineering Design Standards(April 27, 2018) <br /> • City of Ramsey, Capital Improvement Program 2023-2032 <br /> • City of Ramsey, Well Head Protection Plan <br /> • Comprehensive Sanitary Sewer Study(June,2012) <br /> o Update(September, 2017) <br /> • Comprehensive Water System Study(June, 2012) <br /> o Update(September, 2017) <br /> • City of Ramsey 2040 Transportation Plan Update(2022) <br /> • Anoka County 2030 Transportation Plan(December,2008) <br /> • 2022 Wetland Delineation Report <br /> V. EXISTING IMPROVEMENTS <br /> Much of the eastern portion of The COR is developed,while larger tracts in the western portion remain <br /> vacant. The focus of this study involves public improvements required to develop the currently vacant <br /> parcels. A review of the existing infrastructure adjacent to the undeveloped parcels was completed to <br /> provide a basis of future improvements required to complete the infrastructure network in The COR. <br /> Street and Trail Improvements <br /> Sunwood Drive NW <br /> The improvements completed in 2004 provided a fully developed concrete roadway adjacent to the <br /> undeveloped area located in the northwest area of The COR. The boulevard was designed to allow for <br /> future widening and expansion as development and other improvements occur. <br /> Center Street NW <br /> Improvements to Center Street NW were completed in 2014 and included construction of a 36-foot-wide <br /> bituminous street with a 10 foot concrete sidewalk, angled parking along the west side, and parallel <br /> parking stalls along the east side of the street. <br /> The extension of the full Center Street typical section was completed to 100-feet north of 145'Avenue <br /> NW. Then,the eastern half north to Ramsey Parkway was reconstructed with the Sapphire Apartments. <br /> The remaining roadway was then constructed as a temporary street section with bituminous curb north to <br /> Bunker Lake Boulevard. <br /> The alignment of Center Street between Ramsey Parkway and Bunker Lake Boulevard followed the <br /> original plat of Ramsey Town Center. This does not match the revised 2012 COR master plan alignment. <br /> See Figure 4 in Appendix B. <br /> Willemite Street NW&Ramsey Parkway <br /> Willemite Street from Sunwood Drive to Ramsey Parkway and Ramsey Parkway from Willemite Street <br /> to Center Street was constructed in conjunction with the Affinity at Ramsey housing. Street sections were <br /> constructed based recommendation from the original analysis. <br /> Prepared by:Bolton&Menk,Inc. EXISTING IMPROVEMENTS <br /> The COR Analysis 10131.129128 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.