Laserfiche WebLink
stonnwater reuse improvements estimated separately from the roadway improvements in the Cost <br /> Allocation section below. <br /> Willemite Street—The COR Design Framework plan depicts the section as 50 ft face-to-face, 6 ft <br /> boulevards, and 6 ft walks. <br /> Yolite Street—The COR Design Framework plan depicts the section as 36 ft face-to-face, 6 ft <br /> boulevards, and 10 ft walks. This is a local Street,bordering on Subdistricts 1 and 2a. <br /> Zeolite Street-The COR Design Framework plan depicts this roadway as a Connector Street. Within <br /> The COR, Rhinestone Street,Zeolite Street and Veterans Drive (between Rhinestone Street and Zeolite <br /> Street) are considered Connector Streets. Our analysis matches the previously constructed Rhinestone <br /> Street cross section,which consists of a 40 ft face-to-face street section with 6 ft boulevards, and 6 ft <br /> walks. <br /> Veterans Drive-The COR Design Framework plan depicts this roadway as a Local Street, located <br /> within Subdistrict 3, and requiring 6 ft boulevards and 10 ft walks. <br /> Peridot Street-The COR Design Framework plan depicts this roadway as a Local Street, located within <br /> Subdistrict 3, and requiring 6 ft boulevards and 10 ft walks. <br /> Bunker Lake Boulevard—The Anoka.County 2030 Comprehensive plan identifies this roadway as a 4- <br /> lane, divided highway. <br /> V11. ADDITIONAL PUBLIC INFRASTRUCTURE ANALYSIS <br /> As a portion of this analysis,we reviewed the City Comprehensive Plans for sanitary sewer and water <br /> main needs. The following is a summary of results for the various analyses and reviews. <br /> Sanitary Sewer <br /> The segment of trunk sanitary sewer main following the currently platted Ramsey Parkway does not <br /> follow the revised 2012 master plan alignment. This main may need to be realigned when this segment of <br /> Ramsey Parkway is constructed. <br /> An 8-inch gravity sanitary sewer main will be adequate to convey flows from the area. For this analysis, <br /> we included an allowance for 8-inch service lines to be extended to properties along the corridors. <br /> Water Main <br /> Ramsey Parkway includes a 12-inch watermain,which completes an east-west trunk system through The <br /> COR. All existing streets include provisions to extend 8-inch watermain into the study area. Future <br /> roadway construction(other than Ramsey Parkway) should include 8-inch watermain to complete looping <br /> in the study area. In the case that a high-water user plans to develop within the project area, additional <br /> flow analysis should be performed to verify they will have adequate flow and pressure for their individual <br /> needs. <br /> Figure 8 in Appendix B depicts watermain and Figure 9 depicts the sanitary sewer improvements within <br /> the study area. <br /> Storm Water Management <br /> Storm water management concepts were developed to maintain existing drainage patterns and preserve <br /> the conveyance and flood storage capacity of the existing site. <br /> Prepared by:Bolton&Menk,Inc. ADDITIONAL PUBLIC INFRASTRUCTURE ANALYSIS <br /> The COR Analysis 10131.129128 Page 9 <br />