My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Construct bioretention basin in median, lined to prevent infiltration <br /> o Extension of sanitary sewer, storm sewer and watermain. <br /> ■ Reroute existing 18-inch sanitary sewer to new alignment if required with A-1. <br /> • Center Street-Segment B-1 and B-2: <br /> o Extension of Center Street NW to Bunker Lake Boulevard. <br /> ■ Extend the existing typical section from the south to 146'Avenue <br /> ■ Widen Center Street to a Parkway from 146th Avenue to Bunker Lake Boulevard <br /> ■ Subject to Anoka County approval. <br /> o Extension of storm sewer as needed for roadway drainage. <br /> • Willemite Street—Segment C <br /> o Constructed with Affinity at Ramsey Housing <br /> • Sunwood Drive Boulevard- Segments D-1,D-2,D-3 and D-4: <br /> o Construction of sidewalk and plantings along the north side of Sunwood Drive. <br /> ■ Extend the existing boulevard layout used east of Sapphire Street NW <br /> • Yolite Street- Segment E: <br /> o Construction of Yolite Street NW from Sunwood Drive to Ramsey Parkway. <br /> ■ 36-foot roadway with 6-foot sidewalks on both sides <br /> o Extension of watermain. <br /> o Extension of storm sewer for regional pond outlet. <br /> • Zeolite Street-Segment F-1 and F-2: <br /> o Construction of Zeolite Street NW from Sunwood Drive to Bunker Lake Boulevard. <br /> ■ 40-foot roadway with 6-foot sidewalks on both sides. <br /> o Adjust watermain to proposed grades <br /> o Extension of storm sewer for roadway drainage <br /> o Extension of sanitary sewer for service to adjacent parcels <br /> • Bunker Lake Boulevard- Segment G: <br /> o Construction of Bunker Lake Boulevard from Armstrong Boulevard to Ramsey Boulevard. <br /> ■ 4-lane divided roadway with concrete median as depicted in the Anoka County 2030 <br /> Transportation Plan, costs not included in this analysis. <br /> o Anoka County State Aid Highway 116 <br /> • Veterans Drive-Segment H: <br /> o Construction of Veterans Drive from Rhinestone Street to Ramsey Boulevard. <br /> ■ 36-foot roadway with 6-foot sidewalks on both sides. <br /> ■ Subject to Anoka County approval. <br /> o Extension of watermain. <br /> o Extension of storm sewer for roadway drainage. <br /> • Peridot Street- Segment 1: <br /> o Construction of Peridot Street NW from Sunwood Drive to Veterans Drive. <br /> ■ 36-foot roadway with 6-foot sidewalks on both sides. <br /> o Extension of sanitary sewer south from Sunwood Drive. <br /> o Extension of watermain. <br /> o Extension of storm sewer for roadway drainage. <br /> Prepared by:Bolton&Menk,Inc. DESIGN SUMMARY <br /> The COR Analysis 10131.129128 Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.