Laserfiche WebLink
Estimated project costs for each segment were developed to allow for the City to plan for the sequenced <br /> implementation of the improvements and are summarized later in this report. <br /> IX. COST ANALYSIS <br /> Costs estimates were developed for each improvement type. These estimates are based on recent bid <br /> pricing and similar projects. The segments are depicted on Figure 2 in Appendix B. All costs are <br /> presented as 2023 costs. <br /> Ramsey Parkway <br /> Improvement Segment A-1 Segment A-2 <br /> Roadway $ 988,000 $ 500,000 <br /> Trails/Sidewalks $ 196,000 $ 99,000 <br /> Street Lighting $ 289,000 $ 146,000 <br /> Storm Sewer $ 530,000 $ 268,000 <br /> Trunk Stonn Sewer $ 26,000 $ 0 <br /> Watermain $ 246,000 $ 173,000 <br /> Sanitary Sewer $ 104,000 $ 97,000 <br /> Trunk Sanitary Sewer $ 294,000 $ 0 <br /> Total Costs $ 2,673,000 $ 1,283,000 <br /> Center Street <br /> Improvement Segment B-1 Segment B-2 <br /> Roadway $ 114,000 $ 543,000 <br /> Trails/Sidewalks $ 44,000 $ 153,000 <br /> Street Lighting $ 74,000 $ 204,000 <br /> Stone Sewer $ 40,000 $ 132,000 <br /> Watennain $ 0 $ 0 <br /> Sanitary Sewer $ 0 $ 0 <br /> Total Costs $ 272,000 $ 1,032,000 <br /> Yolite Street Zeolite Street <br /> Improvement Segment E Segment F-1 Segment F-2 <br /> Roadway $ 419,000 $ 412,000 $ 426,000 <br /> Trails/Sidewalks $ 118,000 $ 116,000 $ 120,000 <br /> Street Lighting $ 157,000 $ 155,000 $ 159,000 <br /> Stone Sewer $ 102,000 $ 66,000 $ 68,000 <br /> Trunk Stone Sewer $ 112,000 $ 0 $ 81,000 <br /> Watennain $ 169,000 $ 136,000 $ 140,000 <br /> Sanitary Sewer $ 92,000 $ 88,000 $ 91,000 <br /> Total Costs $ 1,169,000 $ 973,000 $ 1,085,000 <br /> Prepared by:Bolton&Menk,Inc. COST ANALYSIS <br /> The COR Analysis 10131.129128 Page 14 <br />