Laserfiche WebLink
Furnish Materials and Installation for a <br /> 'Design-Build' Elevated Boardwalk with attached <br /> and Separate Play equipment Components <br /> Pre-Qualifications: <br /> I. *Bidder/Contactor shall demonstrate that he/she has successfully designed and <br /> installed 3 (three) wood post and framed, or hybrid play component projects of <br /> comparable or greater scope in a county, municipal, state park, or school setting <br /> in MN or WI within the last 5 (five) years. <br /> II. Bidder/Contractor shall confirm his/her capacity to 'field adjust' the radii and <br /> platforms and detail of the construction to achieve the goals, function and play <br /> value pursuant to the intent and specifications below. <br /> III. Contractor is responsible for visiting the site to determine all existing conditions <br /> that may affect the performance of the Work, and may schedule a walk-through <br /> with city staff if desired. <br /> Introduction and General Information: <br /> • In submitting a proposal for this park project, the Contractor warrants that <br /> mobilization and material handling necessary to install ALL play equipment <br /> and improvements as specified is wholly included in their proposal. <br /> • Contractor responsible for viewing the existing site, to review the general <br /> conditions and trees to protect. The City will stake the approximate center of <br /> each platform and the center bridge prior to the Contractor beginning <br /> construction. <br /> • There are no known underground obstructions (E.g. abandoned footings, <br /> utilities) within the new play equipment site. <br /> • This Request for Proposal shall be a Lump Sum, not-to-exceed amount. The <br /> Contractor must include within his/her quote any time or materials necessary <br /> to complete the work in a professional and quality manner. E.g. if matting is <br /> required due to wet conditions or to protect tree rooting zones—this expense <br /> is that of the Contractor. There will be no Change Orders. <br /> • Work site may be required to be enclosed with temporary safety fencing—if <br /> the contractor is not physically on site. Fencing is not required if there are no <br /> equipment or loose items/tools anywhere on site, aside from loose major play <br /> components or lumber/timbers that do not constitute a hazard, and/or <br /> plywood/work mats (if used), which may be present until job completion. <br /> 2 1 q 1'; �„ <br />