18-inches rather than 3. The material is not considered clean because it contains silt and clay, and will become <br /> property of the Contractor. The geotextile fabric is placed to separate the poor underlying soils from the aggregate <br /> base. The extra aggregate base thickness along with the 1-foot of sand build additional strength to help the <br /> pavement bridge the poor soils. During construction,the Contractor will only sub-cut out what they can backfill <br /> to aggregate base by the end of the work day. On similar projects this has been 300 to 400 feet per day. <br /> Preliminary Schedule Remaining <br /> •Hakanson Anderson receives bids and provides a recommendation for award to City Staff <br /> o May 20, 2024 <br /> •Council awards contract to the lowest responsible bidder <br /> o May 28 or June 14, 2024 <br /> o Need to coordinate award with City of Nowthen <br /> •Contractor begins construction <br /> o On or around July 1, 2024 (dependent on Contractor's schedule) <br /> • Substantial Completion <br /> o September 30, 2024 <br /> o Final lift of bituminous pavement in-place,boulevard restoration in-place <br /> •Final Completion <br /> o June 30, 2025 <br /> o Verify final turf establishment,project clean up complete <br /> o Not enough time in the fall for turf establishment to take place after the substantial completion date <br /> Bid Opening <br /> Bids are proposed to be opened on May 20, 2024, and to be presented to the Ramsey City Council either May 28 <br /> or June 14, 2024 for consideration to award a construction contract to the lowest responsible bidder. <br /> Per the approved Joint Powers Agreement with the City of Nowthen,who is partnering with the City of Ramsey <br /> to complete this project,the City of Nowthen is being given the chance to review the bids and vote on awarding <br /> their portion of the project,prior to an award to the Contractor. The project will be bid as an A+B, so if the City <br /> of Nowthen decides not to move forward, only the City of Ramsey portion of the project shall be awarded. Both <br /> cities are fully responsible for all construction and project costs associated with the work within their city limits. <br /> The Nowthen City Council met on Tuesday, April 9, 2024 and approved the City of Nowthen's portion of the <br /> final plans and specifications and authorized advertisement for bids. Additionally, calling for an assessment <br /> hearing and special City Council meeting for May 21, 2024. <br /> Full plans are not attached to this case to prevent potential bidders from downloading plans attached to the case to <br /> prepare and submit their bids,rather than purchasing the plans through QuestCDN, the electronic bidding <br /> software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all <br /> bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the plan sheet <br /> showing the typical sections,which includes information on the proposed pavement sections. Plans are available <br /> upon request from the City Engineer. <br /> The proposed improvements are designated as City Improvement Project#24-03, 2024 NE Ramsey Street <br /> Reconstructions. <br /> Notification: <br /> If Council approves plans and specifications and authorizes advertisement for bids,bids will be advertised on <br /> Friday, April 26, and again on Friday,May 3, 2024 in the City's official newspaper,the Anoka Union Herald. <br /> Additionally, letters will be mailed to property owners with updates on the project status. Engineering Staff <br /> maintains City Improvement webpages with the most current project information,which will also be updated. <br /> Observations/Alternatives: <br />