My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:15:44 AM
Creation date
4/23/2024 1:41:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Services involving non-conventional or deep foundation systems (piles, caissons,etc.). <br /> 13. Services related to the design of supported structural slabs on grade. <br /> 14. Analysis,design, or review related to the effect of Contractor's construction related <br /> equipment(cranes, hoists, lifts,skid-steer loader,etc.) on the primary structure. <br /> 15. Design of swimming pools. <br /> 16. Determination, advice, or services related to the identification, existence, removal or <br /> containment of asbestos or lead based paint; modification, installation, abatement, or <br /> removal of a product, material or process containing asbestos or lead based paint. • <br /> 17. Assessment or design of sound transmission mitigation elements or assemblies. <br /> Mechanical (HVAC and Plumbing) Electrical and Fire Protection Engineering <br /> Schematic Design <br /> 1. Weekly virtual meetings for design and coordination. <br /> 2. Develop MEP system options and document for discussion with Owner. <br /> 3. Attend one in-person meeting with Owner to review Schematic Design. <br /> 4. Deliverable:Schematic Design narrative with supplemental PDF sketches suitable for <br /> budget pricing and design review. <br /> 5. Solar PV Analysis <br /> a. Review conceptual design roof plan to determine amount of Solar PV panels that <br /> could fit on the proposed roofs. <br /> b. Calculate the estimated annual production. <br /> c. Provide a rough-order magnitude cost of the Solar PV system. <br /> 6. Energy Modeling <br /> a. Coordinate with the Owner to establish energy performance goals. <br /> b. Determine SB2030 target EUI for reference. <br /> c. Calculate proposed design EUI using the NEO tool. <br /> d. Provide iterations of the energy model to inform the design — building envelope, <br /> mechanical systems,etc. <br /> MEP System Assumptions <br /> a. HVAC: <br /> a. Packaged rooftop VAV system <br /> b. Kitchen ventilation system <br /> c. General exhaust. <br /> d. Boiler system for hot water reheat. <br /> b. Plumbing: <br /> a. New utilities. <br /> b. New plumbing piping to serve restrooms. <br /> c. Plumbing fixture specifications. <br /> d. Gas system <br /> c. Electrical: <br /> a. Electric service sized to meet code. <br /> b. Electrical connections and receptacles throughout space. <br /> c. Electrical connections to mechanical and Owner provided equipment. <br /> d. Interior Lighting: <br /> a. LED lighting and lighting controls throughout space. <br /> b. Layout and types to be coordinated with Owner and Architect during design. <br /> c. Lighting controls to meet current state energy code where applicable. <br /> e. Fire Protection <br /> a. Provide specifications and plan sheet for scope of work. <br /> f. Low Voltage Design <br /> Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.