Laserfiche WebLink
a. Assumes full design in SD phase. — AN,voice/data,security <br /> Exclusions <br /> 1. Commissioning of building systems <br /> 2. LEED Design and Documentation <br /> 3. Clash Detection <br /> 4. Coordination Studies <br /> Assumptions and Exclusions <br /> Architect's Basic Services do not include the following services,which may be available as <br /> Additional Services: <br /> 1. Food service design and documentation <br /> 2. Additional Consultant services unless outlined above <br /> 3. Cost estimating <br /> 4. Furniture,furnishings, and related equipment(FF&E) services; <br /> 5. Geotechnical engineering investigations and related reports and recommendations,which <br /> need to be provided by the Owner during Schematic Design; <br /> 6. Land surveying services, platting,easement descriptions; <br /> 7. Leasing support; <br /> 8. LEED or other high-performance certification related services except as specifically <br /> provided herein; <br /> 9. Logo design, branding or non-code required Project signage; <br /> 10. Marketing materials and graphics; <br /> 11. Off-site improvements; <br /> 12. Out-of-phase redesign services; <br /> 13. Physical models; <br /> 14. Plan check expeditor; <br /> 15. Pool or water feature; <br /> 16. Radon mitigation systems; <br /> 17. Redesign services required by existing unforeseen field conditions; <br /> 18. Roadway improvements,traffic study and traffic control; <br /> 19. Signage design and super graphics; <br /> 20. Specialty retail design consultation; and <br /> 21. Value engineering*and/or Owner-directed changes to approved design and <br /> documentation <br /> * With respect to value engineering (VE),Architect will work with the Owner throughout the design <br /> process to react to the Owner's cost-related recommendations. However,separate VE exercises that <br /> require changes to the documents after Owner approvals of the design will be considered Additional <br /> Services by Architect. <br /> Project Team <br /> Architecture ............................................................Cuningham <br /> MEP/FP...................................................................Emanuelson-Podas (EP) <br /> Structural Engineering............................................BKBM <br /> Page 5 of 8 <br />