Laserfiche WebLink
Exhibit <br /> accordance with this Section 4.2 shall entitle the Architect to compensation pursuant to Section 11.3 and an <br /> appropriate adjustment in the Architect's schedule. <br /> §4.2.1 Upon recognizing the need to perform the following Additional Services,the Architect shall notify the Owner <br /> with reasonable promptness and explain the facts and circumstances giving rise to the need. The Architect shall not <br /> proceed to provide the following Additional Services until the Architect receives the Owner's written authorization: <br /> .1 Services necessitated by a change in the Initial Information,previous instructions or approvals given <br /> by the Owner,or a material change in the Project including size,quality,complexity,the Owner's <br /> schedule or budget for Cost of the Work,or procurement or delivery method; <br /> .2 Services necessitated by the enactment or revision of codes,laws,or regulations,including changing or <br /> editing previously prepared Instruments of Service; <br /> .3 Changing or editing previously prepared Instruments of Service necessitated by official interpretations <br /> of applicable codes,laws or regulations that are either(a)contrary to specific interpretations by the <br /> applicable authorities having jurisdiction made prior to the issuance of the building permit,or(b) <br /> contrary to requirements of the Instruments of Service when those Instruments of Service were <br /> prepared in accordance with the applicable standard of care; <br /> .4 Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of <br /> performance on the part of the Owner or the Owner's consultants or contractors; <br /> .5 Preparing digital models or other design documentation for transmission to the Owner's consultants <br /> and contractors,or to other Owner-authorized recipients; <br /> .6 Preparation of design and documentation for alternate bid or proposal requests proposed by the Owner; <br /> .7 Preparation for,and attendance at,a public presentation,meeting or hearing; <br /> .8 Preparation for,and attendance at,a dispute resolution proceeding or legal proceeding,except where <br /> the Architect is party thereto; <br /> .9 Evaluation of the qualifications of entities providing bids or proposals; <br /> .1 0 Consultation concerning replacement of Work resulting from fire or other cause during construction; <br /> or, <br /> .11 Assistance to the Initial Decision Maker,if other than the Architect. <br /> §4.2.2 To avoid delay in the Construction Phase,the Architect shall provide the following Additional Services, <br /> notify the Owner with reasonable promptness,and explain the facts and circumstances giving rise to the need. If, <br /> upon receipt of the Architect's notice,the Owner determines that all or parts of the services are not required,the <br /> Owner shall give prompt written notice to the Architect of the Owner's determination. The Owner shall compensate <br /> the Architect for the services provided prior to the Architect's receipt of the Owner's notice. <br /> .1 Reviewing a Contractor's submittal out of sequence from the submittal schedule approved by the <br /> Architect; <br /> .2 Responding to the Contractor's requests for information that are not prepared in accordance with the <br /> Contract Documents or where such information is available to the Contractor from a careful study <br /> and comparison of the Contract Documents,field conditions,other Owner-provided information, <br /> Contractor-prepared coordination drawings,or prior Project correspondence or documentation; <br /> .3 Preparing Change Orders and Construction Change Directives that require evaluation of Contractor's <br /> proposals and supporting data,or the preparation or revision of Instruments of Service; <br /> .4 Evaluating an extensive number of Claims as the Initial Decision Maker;or, <br /> .5 Evaluating substitutions proposed by the Owner or Contractor and making subsequent revisions to <br /> Instruments of Service resulting therefrom. <br /> §4.2.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional <br /> Services. When the limits below are reached,the Architect shall notify the Owner: <br /> .1 ( )reviews of each Shop Drawing,Product Data item,sample and similar submittals of the <br /> Contractor <br /> .2 ( )visits to the site by the Architect during construction <br /> .3 ( )inspections for any portion of the Work to determine whether such portion of the Work is <br /> substantially complete in accordance with the requirements of the Contract Documents <br /> .4 ( )inspections for any portion of the Work to determine final completion. <br /> §4.2.4 Except for services required under Section 3.6.6.5 and those services that do not exceed the limits set forth in <br /> Section 4.2.3,Construction Phase Services provided more than 60 days after(1)the date of Substantial Completion <br /> AIA Document B101 TM—2017.Copyright O 1974,1978,1987,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING: <br /> Init. This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA' Document, 13 <br /> or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This <br /> document was produced by AIA software at 14:48:43 on 12/12/2017 under Order No.3422979013 which expires on 11/08/2018,and is not for resale. <br /> User Notes: (3B9ADA1 D) <br />