Laserfiche WebLink
5. 7. <br /> CC Regular Session <br /> Meeting Date: 04/09/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title: <br /> Adopt Resolution#24-087 Approving Plans and Authorizing Bids for Improvement Project#24-55, 2024 <br /> Pavement Patching Contracted Services <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-087 approving plans and authorizing bids for Improvement <br /> Project#24-55, 2024 Pavement Patching Contracted Services. <br /> Background: <br /> In 2023,the number of City streets having significant numbers of deep potholes and surface stripping increased <br /> to the point that Public Works staff were able to maintain only a small portion of them. This was due in part to the <br /> pervious winter's severe weather conditions,but also due to the age and composition of the pavement sections, as <br /> well as to not receiving regular proactive maintenance treatments over the life of the pavement sections. In 2023, <br /> the City spent almost$1.3M on contracted pavement patching services. <br /> The mild conditions this winter helped prevent a repeat of last year as related to the scope and severity of <br /> potholes observed across the City. This spring, staff drove all City streets and identified various street segments <br /> that will benefit most from skim patching,which include streets in 4 residential neighborhoods totaling 4.12 miles, <br /> and other streets that would benefit most from spray patching,which include streets in 2 neighborhoods totaling <br /> 0.91 miles. Staff will patch the remaining 182-plus miles of paved street segments across the City in-house. <br /> Attached is a figure showing the streets staff proposes to patch using contracted services in 2024. Streets <br /> highlighted in red are proposed to be spray patched,whereas streets highlighted in blue are proposed to be skim <br /> patched. This case only addresses skim patching work. <br /> The contractor that performed last year's skim patching work, Diversified Paving, Inc., warrantied their work for <br /> one-year from the date all work was completed,which was September 21,2023. Based on discussions staff held <br /> with DPI last year this work is anticipated to have a useful life of 3 years or more. To date this work product <br /> appears to be holding up very well. <br /> City streets identified for skim patching in 2024 have numerous deep potholes (deeper than 2-inches)that will <br /> require hand patching before skim patching operations commence. Below is a summary of the skim patching <br /> process; <br /> •City will sweep streets first. <br /> •Contractor will blow debris and water out of deep potholes using compressed air. <br /> •Contractor will apply bituminous tack coat to potholes. <br /> •Contractor will patch deep potholes with hot mix, then compact it. <br /> •Contractor will apply bituminous tack coat to existing pavement. <br /> •Contractor will skim patch streets in both directions, except outside 2+feet in each direction. <br /> •Contractor will compact the new pavement with rubber-tired rollers. <br /> •City will sweep patched streets full width. <br />