My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:14:25 AM
Creation date
4/23/2024 3:41:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON 7533 Sunw©od ©rive NW <br /> Suite 206 <br /> MENK Ramsey, MN 55303-5119 <br /> Real People. Real Solutions. Ph: (763) 433-2851 <br /> Fax: (763) 427-0833 <br /> Bolton-Menk.com <br /> March 5, 2024 <br /> Matt Graf <br /> Lead Utilities Maintenance Worker <br /> City of Ramsey <br /> 7550 Sunwood Drive NW <br /> Ramsey, MN 55303 <br /> RE: Proposal for Lift Station No. 1 Permanent Generator Design and Construction Services <br /> Dear Mr. Graf: <br /> We appreciate the opportunity to assist the City of Ramsey with the design of a permanent generator <br /> for the above-referenced project. <br /> SCOPE OF WORK <br /> Bolton & Menk will assist the City with design, bidding, and construction related services for the project. <br /> We will work with Design Tree as a sub-consultant for services related to electrical and controls. Our <br /> work will include the following tasks: <br /> • Survey—The survey will include right-of-way research along with a topographic survey and <br /> drone image of the site. <br /> • Design—Design services will generally include the following tasks: <br /> o Attendance at design meetings. <br /> o Site visits to review the existing lift station and document existing systems <br /> conditions and locations. <br /> o Construction Documents for the use of permitting, bidding and construction. <br /> • Power Distribution - Design services to include: <br /> o Coordinate the electrical feed point. <br /> o Coordinate with the electric utility as required via telephone or email contact. <br /> o Coordinate space needs of the new ATS equipment. <br /> o Electrical load calculations for sizing a Cat generator. <br /> o Coordinate proposed generator size. Compare diesel and natural gas generators. <br /> o Electrical design for power to generator assembly. <br /> o Design to tie generator alarms into lift station alarms. <br /> o Work with Total Control Systems for control cabinet needs. <br /> • Site Related—Design services will include: <br /> o Prepare two preliminary options for generator/pad location. <br /> o Prepare final site plan with removals, grading, pad, bollards, and restoration. <br /> • Reviews—We will review the final documents with the City and make revisions as needed. <br /> Bolton&Menk is are equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.