My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:14:25 AM
Creation date
4/23/2024 3:41:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n E,,S <br /> www.ae2s.com <br /> April 2, 2024 <br /> Bruce Westby <br /> City of Ramsey <br /> 7550 Sunwood Drive NW <br /> Ramsey, MN 55303 <br /> Re: Water Treatment Plant—Construction Contingency Expense No.4 <br /> Dear Mr. Westby: <br /> AE2S continues to oversee the construction of the City of Ramsey's new WTP. Magney has completed a <br /> majority of the concrete pours at the subgrade level of the Water Treatment Plant along with both the <br /> backwash tank and clearwell base slabs and walls. Our engineering team has continued to coordinate with <br /> Magney and further refine the installation details of other pieces of equipment. Through those <br /> investigations we have identified some items that will require adjustments. This letter is intended to outline <br /> those adjustments and summarize the current project budget in order for the City to fully understand the <br /> status of the project. <br /> Basis for of Construction Continency Expenses: <br /> Currently ten(10)requests for pricing(RFP)have been submitted to Magney. A full list of those requests <br /> are shown below. To date AE2S has received pricing back on all ten(10)of the RFP's,and eight(8)separate <br /> proposals. We would like to move forward and process Construction Contingency Expense No. 4, which <br /> will include price Proposal No. 017,and 018. If the Contractor would like to include a request for extension <br /> as a result of these changes, a formal Change Order request will be issued at a different time. <br /> Proposal RFP Descri tion Total Cost Re uired Status P- <br /> No. No. p q <br /> iff� <br /> 001 001 Mixing Pumps Pipe Upsizing $511287.38 y Approved— <br /> Construction Contingency Expense 1 <br /> 002 003 Admin Ceiling Grid Color $209.25 N Approved— <br /> Construction Contingency Expense 1 <br /> 003 Building Permit $621887 28 y Approved— <br /> Reimbursement Construction Contingency Expense 2 <br /> 004 002 Upsizing Air Exchange in Plate $161580.02 N Approved— <br /> Settler Room Construction Contingency Expense 2 <br /> 005 Storm and Plumbing Updates $221550.28 y Approved— <br /> Construction Contingency Expense 1 <br /> 006 005 Flowable Fill - N Rejected <br /> 007 004 Blower Pipe Upsizing $551230.60 y Approved— <br /> Construction Contingency Ex ense 2 <br /> 008 Groundbreaking Signage $956.12 y Approved— <br /> Reimbursement Construction Contingency Expense 2 <br /> 009 Prevailing Wages $7941153.71 y Approved— <br /> Chan e Order 01 <br /> O10 007 Backwash Supply Piping $3,068.77 y Approved— <br /> Modifications Construction Contingency Expense 3 <br /> O11 Electrical Modifications EXPECTED <br /> 012 Accordion Folding Security $10,010.85 N Approved— <br /> Door Construction Contingency Expense 3 <br /> 013 008 Jet Mixing System Pump $16,834.33 y Approved— <br /> Modifications Construction Contingency Expense 3 <br /> 014 009 Backwash Tank Overflow $1,534.38 y Approved— <br /> Construction Contingency Expense 3 <br /> Advanced Engineering and Environmental Services, Inc. <br /> 6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.