My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:14:25 AM
Creation date
4/23/2024 3:41:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nEs <br /> www.ae2s.coni <br /> 015 Field Order No.4-Door $101922.45 y Approved— <br /> Hardware Changes Construction Contingency Expense 3 <br /> 016 Door Hardware Changes $561724.85 y Approved— <br /> Construction Contingency Expense 3 <br /> 017 012 Filter Slab Modifications $96,634.23 y Pending— <br /> Construction Contingency Expense 4 <br /> 018 Conduit Encasement $5,389.13 y Pending— <br /> Construction Contingency Expense 4 <br /> Note:Any extension delays will be approved as a separate Change Order and will not be included in this Construction <br /> Contingency Expense. <br /> Proposal No. 017(RFP 012): Filter Slab Modifications: <br /> During construction and submittal review,the Contractor and structural engineer identified some concerns <br /> with the constructability of the beams within the Backwash Reclaim Tank and Clearwell that support the <br /> filter slabs above. Upon further review, the structural engineer concluded that additional support features <br /> should be included to increase the factor of safety of the beams. This included increasing the size of the <br /> 241)9x24"beams to 24"x52", thickening the filter slab supporting the underdrain and media, and extending <br /> that slab across all three filters (see the attached RFP No. 012 for changes). This change will increase the <br /> load capabilities of the filter slab and improve the overall structural design to be more resilient. The change <br /> increased the required steel by approximately 28,000 pounds and concrete by approximately 75 cubic yards. <br /> AE2S has worked with the contractor to review the required changes and determine a reasonable price to <br /> make these adjustments. The attached proposal reflects the Contractor's associated costs for these <br /> modifications. <br /> Included with the proposal is a request for a 10-day extension to account for installation and material lead <br /> times as a result of this change. The Contractor has agreed to reassess this request once installation is <br /> completed. AE2S requests that the City work to approve this change in a timely manner to reduce impacts <br /> to the construction schedule and lead times for materials added. <br /> Proposal No. 018: Conduit Encasement: <br /> To ensure that unexpected settlement under the Backwash Reclaim Tank will not occur,the Contractor was <br /> directed to cast-in-place all buried conduit that was to be installed under the tank base slab. The proposal <br /> reflects the Contractor's associated costs for these modifications. <br /> Summary of General Construction Continency Costs: <br /> AE2S has summarized all known construction contingency expenses at this time in order to help the City <br /> of Ramsey better understand the current contingency status. As Construction progresses, AE2S will <br /> continue to provide cost updates and coordinate with City staff. <br /> General Construction Contingency Amount <br /> Expense No. Original Contingency: $950 000.00 <br /> Expense No. 1 $761446.53 <br /> Expense No.2 $135,654.02 <br /> Expense No. 3 $99,095.63 <br /> Expense No.4 $1021023.36 <br /> Net Expenses to Date: $4139219.54 <br /> Available Construction Contingency= $5369780.46 <br /> Advanced Engineering and Environmental Services, Inc. <br /> 6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.