My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:14:25 AM
Creation date
4/23/2024 3:41:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C 0 N S T R U C T 10 N Proposal <br /> COMMERCIAL 6 INDUSTRIAL IONTRAIVUHS <br /> 1401 Park Road - Chanhassen, MN 55317 <br /> wm.magneyconstruction-com 952.474.1674 Office 952.474.1679 Fax <br /> SEND TO <br /> Company name From <br /> AE2S Noah Pundsack <br /> Attention Date <br /> Mr. Ryan Hanson 3/19/2024 ( Revised 03/29/024 ) <br /> E-mail Phone Magney Proposal#017 <br /> ,Eyqn.Hanson@ae2s.com (612)220-0154 1 RFP 012 - Filter Slab Modifications <br /> F] urgent Please comment Fx_1 Please review For your information <br /> Total pages,including cover. 5 <br /> COMMENTS <br /> Re: Ramsey Water Treatment Plant- Ramsey, MN <br /> Ryan, <br /> Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br /> material, and equipment to complete the requested changes In RFP 012 - Filter Slab Modifications. To extend <br /> and thicken the slab at 113'with required rebar modifications, increase the Clearwell and Backwash beam <br /> heights to 52". Along with raising the gullet walls to 121'11". The costs associated with change are <br /> summarized below. <br /> Labor: Additional Labor For Added Concrete Forming & Pouring $ 177282.10 <br /> Material: Additional Concrete, Forming, Pumping, etc. $ 247778.98 <br /> Material: Metro Manufacturing Inc- Enlarge Beam To 12X6X3/8 (see attached) $554 <br /> Material: Rebarfab- Provide Additional 28,015Lbs Of Rebar(see attached) $247949.84 <br /> Material: Plasti-Fab EPS (Added Geofoam Under Gullet Walls) $735.64 <br /> Material: Added Dowel Bar Replacements/ Form Savers $27706.66 <br /> Equipment: Misc. Small Tools and Equipment (10% of Labor) $ 17728.21 <br /> Subcontractor: Bald Eagle Erectors- Install Additional 14 Tons Of Rebar $117009.90 <br /> Subtotal $ 83,745.33 <br /> General Contractor's Overhead $ 117460.81 <br /> Bond & Insurance premiums $ 17428.09 <br /> Lump Sum Total: $ 96,634.23 <br /> Additional Calendar Days Required for this Change (Including material lead time): 10.0 <br /> Please review this proposal and feel free to contact me with any questions, comments or concerns. <br /> Thank you, <br /> NoaA Ptitid Saco <br /> Noah Pundsack <br /> Project Engineer Accepted By Date <br /> Page 1 of 772 <br />
The URL can be used to link to this page
Your browser does not support the video tag.