My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:14:25 AM
Creation date
4/23/2024 3:41:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
METRO MANUFACTURING INC. <br /> & METRO ERECTORS INC. (WBE) <br /> 465 Kenny Road <br /> Saint Paul, MN 55130 <br /> * , PH: 651-776-5455 <br /> Fax: 651-776-2095 <br /> Change Order Proposal <br /> From: Gary Dewing Date: 2/26/2024 <br /> Project: Ramsey Water Treatment Plant Erection: Erection is NOT included in base bid <br /> Location: Ramsey, MN To: Magney Construction (Noah) <br /> Inclusions: RFP#12 <br /> 051200 - Structural Steel Framing <br /> 2/S203 Wind Girts (a- Elev. 115'-1011, (1 (@ approx. 14'-1 1/2" long <br /> Increase material from HSS 10 x 6 x 3/8 TO HSS 12 x 6 x 3/8 <br /> (approx. #150 added weight), shop drawing revisions <br /> Exclusions: Base Bid: $554 <br /> Installation (tax included) <br /> Best Regards, <br /> Gary Dewing <br />
The URL can be used to link to this page
Your browser does not support the video tag.