Laserfiche WebLink
Haugo GeoTechnical Services <br />BORING NUMBER SB-10 <br />AJU G p 2825 Cedar Ave South <br />PAGE 1 OF 1 <br />Minneapolis, MN, 55407 <br />Telephone: 612-729-2 959 <br />Fax: 763-445-2238 <br />CLIENT City of Ramsey <br />PROJECT NAME IP 24-03 Residential <br />PROJECT NUMBER 23-0868 <br />PROJECT LOCATION <br />Ramsey, MN <br />DATE STARTED 12/19/24 COMPLETED 12/19/24 <br />GROUND ELEVATION <br />886 ft HOLE SIZE 3 1/4 inches <br />DRILLING CONTRACTOR HGTS- 45 <br />GROUND WATER LEVELS: <br />DRILLING METHOD Hollow Stem Auger/Split Spoon <br />AT TIME OF DRILLING --- Not Encountered <br />LOGGED BY NC CHECKED BY PG <br />AT END OF DRILLING --- Not Encountered <br />NOTES Ground Surface Elevation Estimated <br />AFTER DRILLING <br />--- Not Encountered <br />w <br />o <br />A SPT N VALUE A <br />cn w <br />20 40 60 80 <br />- <br />_U <br />=O <br />~m <br />_ <br />w� <br />�zZ <br />v^ <br />PL MC LL <br />a <br />O <br />MATERIAL DESCRIPTION <br />w g <br />> C1 <br />O Z) Q <br />a)o <br />I�� <br />p� <br />J <br />aD <br />O- <br />m0>v <br />20 40 60 80 <br />0 <br />z <br />U z <br />< <br />o <br />❑ <br />FINES CONTENT (%) ❑ <br />0.0 <br />20 40 60 80 <br />Approximately 2.5 Inches of Bituminous <br />Approximately 3 Inches of Aggregate Base (Fill) <br />.............................. <br />P-200= 10% <br />AU <br />(CL) Lean Clay, brown, wet, medium (Alluvium) <br />33 <br />........:.......:.......:.......:....... <br />2.5 <br />:............... :....... <br />............... <br />3-3-4 32 <br />LS34S <br />(7) <br />5.0 <br />:............... :....... <br />SS <br />... <br />2-4-4 <br />............ <br />35 <br />(8) <br />(CL) Lean Clay, grey, wet, medium (Alluvium) <br />................ <br />: ............... : ....... <br />7.5 <br />SS <br />........:.......:.......:.......:....... <br />2-3-4 <br />36 <br />(7) <br />10.0 <br />SS <br />2-3-3 <br />37 <br />(6) <br />Bottom of borehole at 11.0 feet. <br />