My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 04/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:38 AM
Creation date
5/6/2024 8:54:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Haugo GeoTechnical Services <br />BORING NUMBER SB-11 <br />AJU G p 2825 Cedar Ave South <br />PAGE 1 OF 1 <br />Minneapolis, MN, 55407 <br />Telephone: 612-729-2 959 <br />Fax: 763-445-2238 <br />CLIENT City of Ramsey <br />PROJECT NAME IP 24-03 Residential <br />PROJECT NUMBER 23-0868 <br />PROJECT LOCATION Ramsey, MN <br />DATE STARTED 12/19/24 COMPLETED 12/19/24 <br />GROUND ELEVATION 885 ft HOLE SIZE 3 1/4 inches <br />DRILLING CONTRACTOR HGTS- 45 <br />GROUND WATER LEVELS: <br />DRILLING METHOD Hollow Stem Auger/Split Spoon <br />AT TIME OF DRILLING --- Not Encountered <br />LOGGED BY NC CHECKED BY PG <br />AT END OF DRILLING --- Not Encountered <br />NOTES Ground Surface Elevation Estimated <br />AFTER DRILLING --- Not Encountered <br />w <br />o <br />A SPT N VALUE A <br />cn w <br />20 40 60 80 <br />- <br />o <br />_U <br />=O <br />O <br />MATERIAL DESCRIPTION <br />~m <br />w <br />_ <br />w� <br />> C1 <br />�zZ <br />O Q <br />v^ <br />PL MC LL <br />I�� <br />p <br />J <br />g <br />o D <br />O- <br />Z) <br />m 0> <br />a)o <br />v <br />20 40 60 80 <br />0 <br />z <br />U z <br />< <br />u <br />E) <br />El CONTENT (%) El <br />^ ^ <br />Approximately 3.75 Inches of Bituminous <br />- <br />Approximately 4 Inches of Aggregate Base <br />.......................... <br />P-200= 26% <br />AU <br />(CL) Lean Clay, brown and grey, wet, rather stiff to rather soft <br />28 <br />_ <br />(Alluvium) <br />2.5 <br />SS <br />3-4-5 <br />31.5 <br />........:.......:.......:.......:. <br />29 <br />(g) <br />5.0 <br />SS <br />2-4-5 <br />................:...............:. <br />30 <br />(g) <br />7.5 <br />SS <br />2-2-3 <br />.......:.......:.......:.......:. <br />_ <br />31 <br />(5) <br />10.0 <br />SS <br />2-2-3 <br />..............:..............:. <br />Bottom of borehole at 11.0 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.