My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 04/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:38 AM
Creation date
5/6/2024 8:54:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No.: 1056358 <br />be revoked by the State at any time, with or without cause. Cause for revoking this right of occupancy <br />includes, but is not limited to, breaching the terms of this or any other agreement (relevant to this Project) <br />with the State, failing to provide adequate traffic control or other safety measures, failing to perform the <br />construction properly and in a timely manner, and failing to observe applicable environmental laws or <br />terms of applicable permits. The State will have no liability to the City (or its contractors or consultants) for <br />revoking this right of occupancy. <br />2.2. State Access; Suspension of Work; Remedial Measures. The State's District Engineer or assigned <br />representative retains the right to enter and inspect the Trunk Highway Right -of -Way (including the <br />construction being performed on such right-of-way) at any time and without notice to the City or its <br />contractor. If the State determines (in its sole discretion) that the construction is not being performed in a <br />proper or timely manner, or that environmental laws (or the terms of permits) are not being complied <br />with, or that traffic control or other necessary safety measures are not being properly implemented, then <br />the State may notify and require the City (and its contractors and consultants) to suspend their operations <br />until the City (and its contractors and consultants) take all necessary actions to rectify the situation to the <br />satisfaction of the State. The State will have no liability to the City (or its contractors or consultants) for <br />exercising or failing to exercise its rights under this provision. <br />2.3. Traffic Control; Worker Safety. While the City (and its contractors and consultants) are occupying the <br />State's Trunk Highway Right -of -Way, they must comply with the approved traffic control plan, and with <br />applicable provisions of the Work Zone Field Handbook <br />(http://www.dot.state.mn.us/trafficeng/workzone/index.html). All City, contractor, and consultant <br />personnel occupying the State's Trunk Highway Right -of -Way must be provided with required reflective <br />clothing and hats. <br />2.4. State Ownership of Improvements. The State will retain ownership of its Trunk Highway Right -of -Way, <br />including any improvements made to such right-of-way under this Agreement, unless otherwise noted. <br />The warranties and guarantees made by the City's contractor with respect to such improvements (if any) <br />will flow to the State. The City will assist the State, as necessary, to enforce such warranties and <br />guarantees, and to obtain recovery from the City's consultants, and contractor (including its sureties) for <br />non-performance of contract work, for design errors and omissions, and for defects in materials and <br />workmanship. Upon request of the State, the City will undertake such actions as are reasonably necessary <br />to transfer or assign contract rights to the State and to permit subrogation by the State with respect to <br />claims against the City's consultants and contractors. <br />3. Contract Award and Construction <br />3.1. Direction, Supervision, and Inspection of Construction. <br />A. The contract construction will be under the direction of the City and under the supervision of a <br />registered professional engineer; however, the State participation construction covered under this <br />Agreement will be open to inspection by the State District Engineer's authorized representatives. The <br />City will give the District Engineer at Roseville five days' notice of its intention to start the contract <br />construction. <br />B. Responsibility for the control of materials for the contract construction will be on the City and its <br />contractor and will be carried out according to Specifications No. 1601 through and including No. 1609 <br />in the State's current "Standard Specifications for Construction". <br />3.2. Completion of Construction. The City will cause the contract construction to be started and completed <br />according to the time schedule in the construction contract special provisions. The completion date for the <br />contract construction may be extended, by an exchange of letters between the appropriate City official <br />-2- <br />Construction within State R/W & Maintenance (Cooperative Agreements) <br />
The URL can be used to link to this page
Your browser does not support the video tag.