My WebLink
|
Help
|
About
|
Sign Out
Home
FINAL 2019 GENERAL FUND BUDGET
Ramsey
>
Finance
>
General Fund Budget
>
2019
>
FINAL 2019 GENERAL FUND BUDGET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2024 1:55:30 PM
Creation date
5/9/2024 1:54:55 PM
Metadata
Fields
Template:
Finance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PERSONNEL COMPLEMENT <br /> Public Works Superintendent 1.00 1.00 1.00 1.00 <br /> Secretary(Formerly under Engineering) - - 1.00 1.00 <br /> Heavy Equipment Operator 1.00 - - - <br /> Mechanic 1.00 2.00 2.00 2.00 <br /> Streets Lead Worker 1.00 1.00 1.00 1.00 <br /> PW Maintenance Worker 3.00 4.00 4,00 5.00 <br /> Temporary-Streets 0.50 0.50 0.50 0.50 <br /> Street Maintenance Total 7.50 8.50 9.50 10.50 <br /> 6488/6489 Other Contracted Services <br /> Street Maintenance Program - <br /> Long term road reconstruction 337,321 485,987 500,000 500,000 <br /> Road Patching 95,313 34,993 10,000 10,000 <br /> 432,634 520,980 510,000 510,000 <br /> 6540-Heavy Machinery <br /> F350 truck with plow 192,507 186,000 <br /> 1-Ton Truck - 61,000 - - <br /> Sidewalk Machine 139,000 <br /> Tractor Backhoe($84,000 total remainder utility funded) 40,250 <br /> Loader 178,973 - - - <br /> 371,480 247,000 - 179,250 <br /> 6580-Other Equipment <br /> Sidewalk Machine 53,234 - - _ <br /> 800 MHZ Radio-3 Year Funding 5,100 5,100 - - <br /> Kubota Tractor- 15,950 - - <br /> ATV Athletic Field Maintenance Machine - 18,000 <br /> 74,284 5,100 18,000 - <br /> DESCRIPTION OF SERVICES: <br /> The Street Maintenance Department Is responsible for maintaining city streets,sidewalks,traffic signs,boulevards,ROW <br /> mowing and the storm water collection system. <br /> BUDGET HIGHLIGHTS <br /> • Full-Time Public Works Maintenance Worker: $57,558(March 1 start) <br /> • Capital Equipment:New Sidwalk Machine: $139,000 <br /> • Capital Equipment:•Replace Tractor/Backhoe: $40,250(net of trade-in&utility funded) <br /> GOALS OF CURRENT YEAR BUDGET: <br /> •Maintain and improve city's rating of 7.0 average of road condition <br /> •Increase use of contracted services on pothole repair(velocity patching) <br /> •Increase prevenative maintenace to prolong the life of our public streets <br /> •Maintain our city vehicles and equipment to the highest level possible <br /> Performance Measurements: <br /> 2017 Actual 2018 Estimate 2019 Projected <br /> Crackfilling(miles) 12.8 7 7 <br /> Sealcoating(miles) 7.73 7.5 7.5 <br /> Asphalt patching(tons) 180 150 150 <br /> -50- <br />
The URL can be used to link to this page
Your browser does not support the video tag.