My WebLink
|
Help
|
About
|
Sign Out
Home
FINAL 2021 GENERAL FUND BUDGET
Ramsey
>
Finance
>
General Fund Budget
>
2021
>
FINAL 2021 GENERAL FUND BUDGET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2024 1:58:54 PM
Creation date
5/9/2024 1:58:26 PM
Metadata
Fields
Template:
Finance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;PERSONNEL COMPLEMENT <br /> Public Works Superintendent 1.00 1.00 1.00 1.00 <br /> Secretary(Formerly under Engineering) 1.00 1.00 1.00 1.00 <br /> Mechanic 2.00 2.00 2.00 2.00 <br /> Streets Lead Worker 1.00 1.00 1.00 1.00 <br /> PW Maintenance Worker 4.00 5.00 5.00 5.00 <br /> Temporary-Streets 0:50 0.50 0.50 0.50 <br /> Street Maintenance Total 9.50 10.50 10.50 10.50 <br /> 6488/6489 Other Contracted Services <br /> Pavement Management Program Funding 300,000 <br /> Cracksealing/Sealcoating 237,483 237,483 500,000 200,000 <br /> Curb Repair/Tree Removal 15,000 15,000 <br /> 237,483 237,483 515,000 515,000 <br /> 6540-Heavy Machinery <br /> F350 truck with plow 197,061 - - 212,500 <br /> 1-Ton Truck 37,577 - - 63,000 <br /> Sidewalk Machine 148,292 - _ <br /> Tractor Backhoe($84,000 total remainder utility funded) 37,688 - - <br /> Sidewalk Machine _ _ <br /> 234,638 185,980 - 275,500 <br /> 6550-Motor Vehicle <br /> 6580-Other Equipment <br /> Sidewalk Machine - - - 146,500 <br /> Trailer for skidsteer - - 11,500 <br /> Toolcat 57,500 <br /> Skidsteer - - 61,000 <br /> ATV Athletic Field Maintenance Machine 14,032 14,032 - - <br /> 14,032 14,032 - 276,500 <br /> DESCRIPTION OF SERVICES: <br /> The Street Maintenance Department is responsible for maintaining city streets,sidewalks,traffic signs,boulevards,ROW <br /> mowing and the storm water collection system. <br /> BUDGET HIGHLIGHTS <br /> • Capital Equipment:All Replacements. See listing above: Total Capital: $578,000 <br /> Replaces aged equipment from a 1998 Felling Trailer to a 2010 Chevy 1-ton truck <br /> See Capital Equipment List for 7 Capital items replaced <br /> GOALS OF CURRENT YEAR BUDGET: <br /> .Maintain and improve city's rating of 7.0 average of road condition <br /> .Increase use of contracted services on pothole repair(velocity patching) <br /> .Increase prevenative maintenace to prolong the life of our public streets <br /> •Maintain our city vehicles and equipment to the highest level possible <br /> Performance Measurements: <br /> -53- <br />
The URL can be used to link to this page
Your browser does not support the video tag.