Laserfiche WebLink
5. ANY SPILLS OF HAZARDOUS MATERIALS AND/OR A MINIMUM OF 5—GALLONS PETROLEUM SHALL BE IMMEDIATELY REPORTED TO <br /> THE MPCA (STATE DUTY OFFICER: 1.800.422.0798 OR 651.297.8610). ANY SPILLS ABOVE THE REPORTABLE QUANTITIES LIMITS IN <br /> THE CODE OF FEDERAL REGULATIONS (CFR) TITLE 40, PART 302 SHALL BE REPORTED TO THE EPA NATIONAL RESPONSE CENTER <br /> (1.800.424.8802). IN ORDER TO REDUCE THE RISK OF HAZARDOUS MATERIALS COMING INTO CONTACT WITH STORM WATER, THE <br /> FOLLOWING PRACTICES WILL BE FOLLOWED: A) AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCTS REQUIRED TO DO <br /> THE WORK, B) ALL MATERIALS STORED ON SITE WILL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR APPROPRIATE <br /> CONTAINERS AND IF POSSIBLE, UNDER COVER, C) PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL ITEM D E S C P R I P TI 0 N UNIT ESTIMATED QUANTITY <br /> MANUFACTURER'S LABEL UNLESS THE ORIGINAL CONTAINER CANNOT BE RESEALED, IN WHICH CASE THE ORIGINAL LABEL AND <br /> MATERIALS SAFETY DATA SHALL BE RETAINED, D) SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED <br /> BY THE MANUFACTURER, E) WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED BEFORE DISPOSING OF THE CONTAINER, F) CONSTRUCTION LIMIT STAKING LF 6917 <br /> THE MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL WILL BE FOLLOWED, AND G) THE OPERATOR WILL <br /> INSPECT DAILY TO ENSURE PROPER USE AND DISPOSAL OF MATERIALS ON SITE. MANUFACTURER'S RECOMMENDED METHODS FOR ROCK CONSTRUCTION ENTRANCE EA 1 <br /> SPILL CLEANUP WILL BE CLEARLY POSTED AND SITE PERSONNEL WILL BE MADE AWARE OF THE PROCEDURES AND THE LOCATION <br /> OF THE INFORMATION AND CLEANUP SUPPLIES. ROCK CONSTRUCTION ENTRANCE MAINTENANCE EA 1 <br /> 6. ALL SANITARY WASTE WILL BE COLLECTED BY TEMPORARY SANITARY FACILITIES PROVIDED AT THE SITE BY THE CONTRACTOR EROSION CONTROL FENCE LF 6 718 <br /> THROUGHOUT THE CONSTRUCTION PROJECT. ALL CONSTRUCTION PERSONNEL SHALL UTILIZE TEMPORARY SANITARY FACILITIES, <br /> WHICH SHALL BE REGULARLY SERVICE BY A COMMERCIAL OPERATOR. TEMPORARY SANITARY FACILITIES SHALL BE PLACED IN A MAINTENANCE OF PERIMETER EROSION CONTROL YR 1 <br /> LOCATION WHERE ACCIDENTAL SPILLAGE OF THE FACILITY SHALL NOT DISCHARGE TO THE STORM SEWER SYSTEM. <br /> TEMPORARY SEDIMENTATION BASINS (14.2) BIOROLL DITCH CHECK EA 24STREET SWEEPING AND VACUUMING YR 1 <br /> 1. TEMPORARY SEDIMENTATION BASINS ARE REQUIRED WHERE 10 OR MORE ACRES DRAIN TO A COMMON LOCATION TO PROVIDE <br /> TREATMENT OF THE RUNOFF BEFORE IT LEAVES THE CONSTRUCTION SITE OR ENTERS SURFACE WATERS. WHEN A CONSTRUCTION STORM DRAIN INLET PROTECTION EA 28 <br /> SITE DISCHARGES TO AN IMPAIRED WATER BODY, TEMPORARY SEDIMENTATION BASINS ARE REQUIRED WHERE 5 OR MORE ACRES <br /> DRAIN TO A COMMON LOCATION. TEMPORARY SEDIMENTATION BASINS CAN BE CONVERTED TO PERMANENT BASINS AFTER TEMPORARY SEED AND MULCH AC 18. 0 <br /> CONSTRUCTION IS COMPLETE. <br /> 2. THE TEMPORARY BASIN MUST PROVIDE LIVE STORAGE FOR A CALCULATED VOLUME OF RUNOFF FROM A TWO (2)—YEAR, 24—HOUR PERMANENT SEED AND MULCH AC 18. 0 <br /> STORM FROM EACH ACRE DRAINED TO THE BASIN OR 1,800 CUBIC FEET OF LIVE STORAGE PER ACRE DRAINED, WHICHEVER IS MAINTAIN SEED AND MULCH AC 18. 0 <br /> GREATER. WHERE PERMITTEES HAVE NOT CALCULATED THE TWO (2)—YEAR, 24—HOUR STORM RUNOFF AMOUNT, THE TEMPORARY <br /> BASIN MUST PROVIDE 3,600 CUBIC FEET OF LIVE STORAGE PER ACRE OF THE BASINS DRAINAGE AREA. EROSION CONTROL BLANKET (MNDOT CAT. 2 0) S Y 16600 <br /> 3. PERMITTEES MUST DESIGN THE OUTLET STRUCTURE TO WITHDRAW WATER FROM THE SURFACE TO MINIMIZE THE DISCHARGE OF VEHICLE AND EQUIPMENT CLEANING LS 1 <br /> POLLUTANTS. PERMITTEES MAY TEMPORARILY SUSPEND THE USE OF A SURFACE WITHDRAWAL MECHANISM DURING FROZEN <br /> CONDITIONS. THE BASIN MUST INCLUDE A STABILIZED EMERGENCY OVERFLOW TO PREVENT FAILURE OF POND INTEGRITY. PROVIDE VEHICLE AND EQUIPMENT FUELING LS 1 <br /> ENERGY DISSIPATION FOR THE BASIN OUTLET WITHIN 24 HOURS OF CONNECTION TO A SURFACE WATER. <br /> 4. WHERE A TEMPORARY SEDIMENT BASIN MEETING THE REQUIREMENTS OF THE AS AND/ORBOVE IS INFEASIBLE, PERMITTEES MUST INSTALL VEHICLE AND EQUIPMENT MAINTENANCE LS 1 <br /> EFFECTATVE <br /> BUFFER IVSTR PSIMENT OR ANYTROLS SUCH AS SMALLER APPROPRIATE COMBINATION OFMEASURES MENT NAS DICTATED EBY INDIVIDUAL SITE CONDITIONS. INDIMENT TRAPS, SILT FENCES, DEITERMINING SPILL PREVENTION AND CONTROL LS 1 <br /> WHETHER INSTALLING A SEDIMENT BASIN IS INFEASIBLE, PERMITTEES MUST CONSIDER PUBLIC SAFETY AND MAY CONSIDER <br /> FACTORS SUCH AS SITE SOILS, SLOPE, AND AVAILABLE AREA ON—SITE. PERMITTEES MUST DOCUMENT THIS DETERMINATION OF ROCK BERM EROSION CONTROL LS 1 <br /> INFEASIBILITY IN THE SWPPP. <br /> FINAL STABILIZATION (4.1 ) RIP RAP ENERGY DISSIPATOR CY 27. 1 <br /> 1. ALL DISTURBED AREAS SHALL BE PERMANENTLY STABILIZED AS SHOWN ON THE CONSTRUCTION PLANS. METHODS TO ACHIEVE INDIVIDUAL LOT HOME CONSTRUCTION EROSION CONTROL EA 57 <br /> FINAL STABILIZATION INCLUDE: SEED WITH MULCH OR EROSION CONTROL BLANKET AND SOD. <br /> 2. ALL AREAS SEEDED BY MEANS OF BROADCAST SEEDING SHALL BE HAND RAKED TO INCORPORATE THE SEEDS INTO THE TOPSOIL. <br /> 3. EROSION CONTROL BLANKETS SHALL BE PLACED IN THE DITCH BOTTOM WITHIN 24 HOURS AFTER FINE GRADING. BIOROLLS SHALL <br /> BE PLACED IN CONJUNCTION WITH THE BLANKET IN THE DITCH BOTTOMS. THE BIOROLLS ARE INTENDED TO SERVE AS PERMANENT <br /> DITCH CHECKS. <br /> 4. THE PERMITTEE WILL SUBMIT A NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER FINAL STABILIZATION. FINAL STABILIZATION <br /> SHALL CONSIST OF A UNIFORM PERENNIAL VEGETATIVE COVER OF AT LEAST 70 PERCENT OF THE EXPECTED FINAL VEGETATIVE <br /> GROWTH DENSITY OR OTHER PERMANENT COVER HAS BEEN ESTABLISHED OVER THE ENTIRE PERVIOUS SURFACES. <br /> 5. PERMIT COVERAGE TERMINATES ON INDIVIDUAL LOTS IF THE STRUCTURES ARE FINISHED AND TEMPORARY EROSION PREVENTION <br /> AND DOWNGRADIENT PERIMETER CONTROL IS COMPLETE, THE RESIDENCE SELLS TO THE HOMEOWNER, AND THE PERMITTEE <br /> DISTRIBUTES THE MPCA'S "HOMEOWNER FACT SHEET" TO THE HOMEOWNER. <br /> AMENDMENT BY DATE <br /> PERMIT TERMINATION CONDITIONS (13.1 ) <br /> 1. PERMITTEES MUST COMPLETE ALL CONSTRUCTION ACTIVITY AND MUST INSTALL PERMANENT COVER OVER ALL AREAS PRIOR TO <br /> SUBMITTING THE NOTICE OF TERMINATION (NOT). VEGETATIVE COVER MUST CONSIST OF A UNIFORM PERENNIAL VEGETATION WITH A <br /> DENSITY OF 70 PERCENT OF ITS EXPECTED FINAL GROWTH. VEGETATION IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC <br /> AREA DICTATES NO VEGETATION, SUCH AS IMPERVIOUS SURFACES OR THE BASE OF A SAND FILTER. <br /> 2. FOR RESIDENTIAL CONSTRUCTION ONLY, PERMIT COVERAGE TERMINATES ON INDIVIDUAL LOTS IF THE LOT IS SOLD TO THE <br /> HOMEOWNER, STRUCTURES ARE FINISHED, AND PERMANENT COVER HAS BEEN ESTABLISHED. FOR LOTS THAT ARE SOLD TO THE <br /> HOMEOWNER WHERE PERMANENT COVER HAS NOT BEEN ESTABLISHED, COVERAGE TERMINATES IF TEMPORARY EROSION <br /> PREVENTION AND DOWNGRADIENT PERIMETER CONTROL IS PROPERLY INSTALLED, AND THE PERMITTEE DISTRIBUTES THE MPCA'S <br /> "HOMEOWNER FACT SHEET" TO THE HOMEOWNER. <br /> 3. WHEN SUBMITTING THE NOT PERMITTEES MUST INCLUDE EITHER GROUND OR AERIAL PHOTOGRAPHS SHOWING THE REQUIREMENTS <br /> OF 13.2 HAVE BEEN MET. PERMITTEES ARE NOT REQUIRED TO TAKE PHOTOGRAPHS OF EVERY DISTINCT PART OF THE SITE, <br /> HOWEVER THE CONDITIONS PORTRAYED MUST BE SUBSTANTIALLY SIMILAR TO THOSE AREAS THAT ARE NOT PHOTOGRAPHED. <br /> PHOTOGRAPHS MUST BE CLEAR AND IN FOCUS AND MUST INCLUDE THE DATE THE PHOTO WAS TAKEN. <br /> RECORDS RETENTION (5.1 &6.1 ) <br /> 1. RECORDS MUST BE KEPT ON SITE IN A PHYSICAL OR ELECTRONIC FORMAT DURING NORMAL WORKING HOURS WITH PERSONNEL <br /> WHO HAVE OPERATIONAL CONTROL OVER THE APPLICABLE PORTION OF THE SITE. THESE RECORDS MUST INCLUDE: <br /> A. COPY OF THE SWPPP AND AMENDMENTS <br /> B. TRAINING DOCUMENTATION <br /> C. INPPECTION AND MAINTENANCE RECORDS <br /> 2. THIS SWPPP WILL BE AMENDED AS NEEDED AND/OR AS REQUIRED BY PROVISIONS OF THE PERMIT. ANY CHANGES TO THE SWPPP <br /> SHALL BE NOTED BELOW AND ON THE APPLICABLE PLAN SHEETS. ANY AMENDMENTS TO THE SWPPP MUST BE INCORPORATED <br /> WITHIN 7 DAYS TO INCLUDE ADDITIONAL OR MODIFIED BMPS. NOTE: <br /> 3. THE CONTRACTOR WILL RECORD CHANGES TO THE SWPPP AND MAINTAIN DOCUMENTATION OF THESE CHANGES ON SITE AT ALL SEE SHEET 5.51 FOR OUTLET CONTROL STRUCTURE DETAILS <br /> TIMES. A SUMMARY MAINTENANCE/CONSTRUCTION OBSERVATION REPORT WILL BE RECORDED AFTER EACH SITE <br /> INSPECTION/OBSERVATION. <br /> 4. THE CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN AND REPAIR THE EROSION AND SEDIMENT CONTROL BMP'S UNTIL FINAL <br /> STABILIZATION IS COMPLETE AND A NOTICE OF TERMINATION (NOT) IS SUBMITTED. <br /> P118MBNEERengineering <br /> 00-ENG-123074-SHEET-SWPPP <br /> CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS <br /> Revisions STORMWATER POLLUTION <br /> 7am <br /> hereby certify that this plan was prepared by Date �7�7 7� HARMONY FARMS <br /> (651)681-1914 Name /�LtQrlt. 1. 2024-02-05 City Comments LElV 1V Aim <br /> 2422 Enterprise Drive e or under my direct supervision and that I <br /> Mendota Heights,MN 55120 Fax: 681-9488 a duly Licensed Professional Engineer Brian N.Molinaro Designed 16305 36TH AVE.NO., SUITE 600 ��, OF 30 <br /> www.plorieererig.COmder the laws of the State of Minnesota Reg.No. 47504 Date Drawn PREVENTION PLAN PLYMOUTH,MINNESOTA 55446 RAMSEY,MINNESOTA <br /> ©2023 Pioneer Engineering,P.A. <br />