STORMWATER POLLUTION PREVENTION PLAN ( SWPPP' y THE CONTRACTOR SHALL ENSURE THAT THE TRAINING REQUIREMENTS IN PART 21.1 OF THE GENERAL STORMWATER 1. DEWATERING IS NOT ANTICIPATED ON THIS PROJECT. HOWEVER, IF DEWATERING IS NECESSARY, THE CONTRACTOR SHALL SUBMIT A
<br /> TO COMPLY WITH THE GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY PERMIT FOR CONSTRUCTION ACTIVITY ARE COMPLIED WITH. THE INDIVIDUALS TRAINED WILL BE RECORDED IN THE SWPPP PLAN TO THE ENGINEER FOR ACCEPTANCE.
<br /> BEFORE THE START OF CONSTRUCTION OR AS SOON AS PERSONNEL FOR THE PROJECT HAVE BEEN DETERMINED.
<br /> THE FULL STORMWATER MANAGEMENT PLAN IS A SEPARATE DOCUMENT AVAILABLE UPON REQUEST PROVIDE INFORMATION IN THE SPACE PROVIDED BELOW FOR ADDITIONAL PERSONNEL ON THE PROJECT AS REQUIRED BY 2. IF DEWATERING IS NECESSARY, IT MUST NOT CAUSE NUISANCE CONDITIONS IN SURFACE WATERS FROM DEWATERING AND BASIN
<br /> THE PERMIT. DRAINING DISCHARGE.
<br /> CONSTRUCTION ACTIVITY INFORMATION SWPPP DESIGNER COMPANY CERTIFICATION 3. IF THE DEWATERING OR PUMPING PROCESS IS TURBID OR CONTAINS SEDIMENT LADEN WATER, IT MUST BE TREATED
<br /> PROJECT NAME: HARMONY FARMS THROUGH THE USE OF A SEDIMENT CONTROL (TRAPS, VEGETATIVE FILTER STRIPS, FLOCCULANTS OR OTHER SEDIMENT
<br /> PROJECT LOCATION: REDUCING MEASURES) SUCH THAT DISCHARGE DOES NOT VISIBLY CONTAIN MORE TURBIDITY THAN THE RECEIVING WATER.
<br /> NOWTHEN BLVD N.W. & 167TH AVE N.W.
<br /> RAMSEY. MINNESOTA 55303 SWPPP INSTALLER 4. WHEN POSSIBLE, USE WELL VEGETATED (EG. GRASSY OR WOODED) UPLAND AREAS ON THE SITE TO INFILTRATE DEWATERING
<br /> ANOKA COUNTY WATERS BEFORE DISCHARGED OFF SITE.
<br /> LA11TUDEAONGITUDE:45.273713, -93.439776
<br /> 5. DISCHARGE DIRECTLY INTO A SURFACE WATER OR WETLAND IS NOT PERMITTED. RECEIVING WATERS CANNOT BE USED AS PART OF
<br /> TOTAL PROJECT AREA DISTURBED: 23.3 ACRES
<br /> SWPPP INSPECTOR THE TREATMENT AREA.
<br /> TOTAL EXISTING IMPERVIOUS AREA: 0.0 ACRES 6. ALL CONSTRUCTION DEWATERING SHALL BE DISCHARGED TO AN APPROVED LOCATION FOR TREATMENT PRIOR TO
<br /> TOTAL PROPOSED IMPERVIOUS AREA: 7.3 ACRES DISCHARGE TO THE RECEIVING WATER. THE DEWATERING PLAN SHALL BE DEVELOPED AND SUBMITTED TO THE
<br /> ENGINEER FOR REVIEW IN ACCORDANCE WITH MNDOT SPEC. 1717.2E.
<br /> RECEIVING WATERS: PERMANENT STORMWATER MANAGEMENT SYSTEM (15.1 ) 7. CONDITIONS OF THE SITE MAY REQUIRE A PERMIT TO BE OBTAINED FROM THE MINNESOTA DEPARTMENT OF NATURAL
<br /> TROTT BROOK 1. THE PROJECT WILL CREATE A NEW CUMULATIVE IMPERVIOUS SURFACE GREATER THAN OR EQUAL TO ONE ACRE. THE RESOURCES FOR WATER APPROPRIATIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING ANY NECESSARY
<br /> PROJECT PROPOSES TO CONSTRUCT A STORMWATER TREATMENT SYSTEM TO COLLECT RUNOFF TO BE DISCHARGED PERMITS FOR DEWATERING.
<br /> OFFSITE. TREATMENT FOR THE RUNOFF IS TO BE EXECUTED BY THE PROPOSED STORMWATER MANAGEMENT SYSTEM.
<br /> CALCULATIONS DETAILING THE BASINS ARE AVAILABLE UPON REQUEST. 8. THE DISCHARGE POINT OF DEWATERING WATERS SHOULD BE VISUALLY INSPECTED AND PHOTOGRAPHED AT THE BEGINNING OF
<br /> DATES OF CONSTRUCTION: OPERATION AND AT LEAST ONCE EVERY 24 HOURS OF OPERATION TO ENSURE EXCESS TURBIDITY IS NOT BEING RELEASED TO
<br /> CONSTRUCTION START DATE: MAY 1. 2024 EST. COMPLETION DATE: OCTOBER 1. 2026 BM P SELECTION & STORMWATER MANAGEMENT (7.1 ) THE RECEIVING WATERS.'
<br /> 1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THE BMPS IDENTIFIED IN THIS PLAN IN AN APPROPRIATE AND
<br /> FUNCTIONAL MANNER AND IN ACCORDANCE WITH RELEVANT MANUFACTURER SPECIFICATIONS AND ACCEPTED ACTIONS MUST OCCUR BEFORE DEWATERING IS RESUMED. NUISANCE CONDITIONS INCLUDES, BUT IS NOT LIMITED TO, A SEDIMENT 9. IF NUISANCE CONDITIONS RESULT FROM THE DISCHARGE, PERMITTEES MUST CEASE DEWATERING IMMEDIATELY AND CORRECTIVE
<br /> CONTACT INFORMATION
<br /> ENGINEERING PRACTICES TO MINIMIZE THE DISCHARGE OF POLLUTANTS IN STORMWATER FROM CONSTRUCTION PLUME IN THE DISCHARGE OR THE DISCHARGE APPEARS CLOUDY, OR OPAQUE, OR HAS A VISIBLE CONTRAST, OR HAS A VISIBLE
<br /> PROJECT OWNER CONTRACTOR: ACTIVITIES. THESE BMPS SHALL BE INSPECTED BY THE CITY.LENNAR HOMES TBD OIL FILM, OR HAS AQUATIC HABITAT DEGRADATION THAT CAN BE IDENTIFIED BY AN OBSERVER.
<br /> (SWPPP TO BE PROVIDED BY LENNAR) 2. THE CONTRACTOR SHOULD CONSTRUCT TEMPORARY OR PERMANENT WET SEDIMENTATION BASINS IDENTIFIED IN THIS
<br /> PLAN (WHEN REQUIRED, SEE SECTION 14 AND 15) AS A FIRST STEP IN CONSTRUCTION AND STORMWATER ROUTED TO
<br /> THESE. INSPECTIONS AND MAINTENANCE (11 .1 )
<br /> 3. THE CONTRACTOR MUST PHASE CONSTRUCTION SO TO LIMIT DISTURBED LAND TO AREAS THAT CAN BE EFFECTIVELY 1. THE CONTRACTOR SHALL IDENTIFY A CERTIFIED EROSION AND SEDIMENT CONTROL SUPERVISOR TO CONDUCT INSPECTIONS FOR THE
<br /> GENERAL CONSTRUCTION PROJECT INFORMATION INSPECTED AND MAINTAINED. PER SECTION 11 OF THE PERMIT. PROJECT.
<br /> THE CONSTRUCTION OF ENTRANCE TURN LANE, BITUMINOUS PATHS, STREETS A THROUGH D, AND 57 LOTS FOR RESIDENTIAL 4. ALL EROSION CONTROL NETTING USED ON THE SITE AS PART OF THE SOIL STABILIZATION TECHNIQUES, ARE 2. THE CONSTRUCTION SITE SHALL BE OBSERVED AT LEAST ONCE EVERY 7 DAYS DURING ACTIVE CONSTRUCTION AND
<br /> DEVELOPMENT. THIS CONSTRUCTION WILL COMPLETE GRADING, INSTALLATION OF SANITARY SEWER, WATERMAIN, STORM SEWER, ENCOURAGED TO USE PRODUCTS THAT HAVE BEEN SHOWN TO MINIMIZE IMPACTS ON WILDLIFE. THE U.S. FISH & WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS AND 7 DAYS AFTER THAT. PER SECTION
<br /> CONCRETE CURB AND GUTTER, BITUMINOUS SURFACING, STREET LIGHTING, LANDSCAPING, EROSION CONTROL, AND TURF WILDLIFE SERVICE RECOMMENDS USING TYPES OF NETTING PRACTICES THAT ARE CONSIDERED "WILDLIFE FRIENDLY," 11.11 THE INSPECTION CAN BE ADJUSTED AS FOLLOW:
<br /> ESTABLISHMENT. INCLUDING THOSE THAT USE NATURAL FIBER OR 100 PERCENT BIODEGRADABLE MATERIALS AND THAT USE A LOOSE AREAS WITH PERMANENT COVER CAN BE REDUCED TO ONCE A MONTH
<br /> WEAVE WITH A NON-WELDED, MOVABLE JOINTED NETTING. SITES WITH PERMANENT COVER AND NO CONSTRUCTION ACTIVITY CAN BE REDUCED TO ONCE A MONTH
<br /> BASED ON THE SOIL BORINGS THAT WERE RETRIEVED FROM THE SITE, SOILS ENCOUNTERED ON SITE 0 WHERE CONSTRUCTION ACTIVITY HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, INSPECTION MAY BE SUSPENDED
<br /> ARE POORLY GRADED SAND, SILTY SAND AND LEAN CLAY. EROSION PREVENTION PRACTICES (8.1 ) AND RESUME WITHIN 24 HOURS OF RUNOFF OCCURRING
<br /> 1. THE CONTRACTOR SHALL PHASE THE WORK TO LIMIT THE OVERALL DISTURBANCE OF THE PROJECT AT ANY GIVEN
<br /> GENERAL SITE INFORMATION (I I I.A) TIME. NATURAL VEGETATIVE BUFFERS SHALL BE MAINTAINED BETWEEN THE WORK LIMITS AND ALL SURFACE WATERS 3. WHEN SEDIMENT IS OBSERVED UP TO APPROXIMATELY ONE-THIRD OF THE HEIGHT OF SILT FENCE, SEDIMENT SHALL BE REMOVED.
<br /> 1. THE PROJECT IS REQUIRED TO MEET THE CONSTRUCTION STORMWATER REQUIREMENTS FOR THE NPDES GENERAL STORMWATER OR WETLANDS THROUGHOUT THE COURSE OF CONSTRUCTION. SILT FENCE WILL BE REPLACED, OR SUPPLEMENTED IF IT BECOMES NON-FUNCTIONAL.
<br /> PERMIT AND MNDOT SPEC. 1717, 2573, AND 2575.
<br /> 2. THE AREAS NOT TO BE DISTURBED WILL BE DELINEATED THROUGH THE USE OF SILT FENCE, BIOROLLS AND 4. THE CITY OF RAMSEY IS RESPONSIBLE TO MAINTAIN PERMANENT BMP'S.
<br /> 2. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH MNDOT CONSTRUCTION STAKING.
<br /> GENERAL CONDITIONS 2573 TO BE INSPECTED BY THE CITY PRIOR TO STARTING ANY CONSTRUCTION OPERATION THAT MAY 5. DURING EACH INSPECTION THE FOLLOWING SHALL BE OBSERVED:
<br /> CAUSE ANY SEDIMENTATION OR SILTATION AT THE SITE. 3. THE CONTRACTOR SHALL MAINTAIN A NATURAL, VEGETATED BUFFER ADJACENT TO THE WETLANDS WHEREVER ALL EROSION PREVENTION AND SEDIMENT CONTROL BMP'S AND POLLUTION PREVENTION MEASURES.
<br /> POSSIBLE DURING CONSTRUCTION. SURFACE WATERS - INCLUDING DITCHES AND CONVEYANCE SYSTEMS NEED TO BE OBSERVED FOR EROSION AND SEDIMENT.
<br /> 3. LOCATIONS, TYPE AND QUANTITY OF TEMPORARY AND PERMANENT EROSION CONTROL MEASURES CAN BE FOUND WITHIN THE
<br /> CONSTRUCTION PLANS. 4. TEMPORARY COVER SHALL BE PROVIDED USING TEMPORARY SEED WITH EROSION CONTROL BLANKET OR HYDROMULCH. CONSTRUCTION SITE VEHICLE EXIT LOCATIONS FOR EVIDENCE OF TRACKING ONTO PAVED SURFACES.
<br /> • INSPECT SURROUNDING PROPERTIES FOR EVIDENCE OF OFF SITE SEDIMENT ACCUMULATION.
<br /> 4. THE PROJECT IS LOCATED WITHIN 1 MILE AND FLOWS TO AN IMPAIRED WATER BODY. THEREFORE, THE PROJECT WILL NEED TO 5. PERMANENT COVER SHALL BE PROVIDED AS DETAILED ON THE CONSTRUCTION PLANS USING SEED WITH EROSION INFILTRATION AREAS FOR SIGNS OF SEDIMENT DEPOSITION AND COMPACTION (TO ENSURE THAT EQUIPMENT IS NOT BEING DRIVEN
<br /> STABILIZE ALL EXPOSED SOILS NO LATER THAN 7 DAYS. DITCHES OR RAVINES THROUGHOUT THE PROJECT THAT ARE CONTROL BLANKET OR HYDROMULCH. PERMITTEES MUST NOT USE MULCH, HYDROMULCH, TACKIFIER, ACROSS THE AREA).
<br /> DISTURBED SHALL BE STABILIZED WITHIN 24 HOURS. POLYACRYLAMIDE OR SIMILAR EROSION PREVENTION PRACTICES WITHIN ANY PORTION OF THE NORMAL WETTED
<br /> PERIMETER OF A TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE SECTION WITH A CONTINUOUS SLOPE OF 7. RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES IN WRITING WITHIN 24 HOURS. SUBMIT INSPECTION REPORTS IN A FORMAT
<br /> 5. THE PROJECT IS LOCATED WITH 1 MILE AND FLOWS TO AN IMPAIRED WATER BODY. THEREFORE, TEMPORARY SEDIMENT BASINS GREATER THAN 2 PERCENT THAT IS ACCEPTABLE TO THE PROJECT ENGINEER. INCLUDE THE FOLLOWING IN THE RECORDS OF EACH INSPECTION AND
<br /> ARE NEEDED FOR DRAINAGE AREAS OF 5 ACRES OR MORE FLOWING TO A COMMON LOCATION. MAINTENANCE ACTIVITY:
<br /> 6. THE CONTRACTOR IS REQUIRED TO PROVIDE ANY ADDITIONAL EROSION PREVENTION MEASURES NECESSARY FOR 0DATE AND TIME OF INSPECTIONS
<br /> 6. THE CONTRACTOR SHALL INSTALL ADDITIONAL BMP'S AS NECESSARY TO PREVENT SEDIMENT TRANSPORT PER PERMIT CONFORMANCE TO THE NPDES CONSTRUCTION PERMIT THROUGHOUT CONSTRUCTION. 0NAME OF PERSONS CONDUCTING INSPECTIONS
<br /> REQUIREMENTS FINDINGS OF INSPECTIONS WITH PHOTOGRAPHS AND RECOMMENDATIONS FOR CORRECTIVE ACTIONS
<br /> 7. STABILIZATION TIME FRAMES - INITIATE STABILIZATION IMMEDIATELY WHEN CONSTRUCTION TEMPORARILY OR CORRECTIVE ACTIONS TAKEN, INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE ACTIVITIES
<br /> 7. INLET PROTECTION, SILT FENCE AND BIOROLLS SHALL BE INSTALLED IN THE FIELD AS SHOWN ON THE PLANS AS DIRECTED BY PERMANENTLY CEASES ON A PORTION OF THE SITE. COMPLETE STABILIZATION WITHIN THE TIME FRAMES LISTED. DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5 INCH IN 24 HOURS
<br /> THE ENGINEER. 7.1. LAST 200 LINEAL FEET OF DITCH OR SWALE 24 HOURS OF CONNECTION TO SURFACE WATERS DOCUMENT AND DISCHARGES, DEWATERING OPERATIONS AND NUISANCE CONDITIONS WITH PHOTOGRAPHS.
<br /> 7.2. REMAINING DITCH OR SWALE 7 DAYS 0DOCUMENTS AND CHANGES MADE TO THE SWPPP
<br /> 8. PERMIT COVERAGE FOR THIS PROJECT CANNOT BE ISSUED UNTIL ALL OF THE REQUIREMENTS OF SECTION 22 OF THE GENERAL 7.3. PIPE AND CULVERT OUTLETS 24 HOURS
<br /> STORMWATER PERMIT WITH REGARDS TO WETLAND PERMITTING, DECISIONS, AND MITIGATIVE SEQUENCING HAVE BEEN FINALIZED 7.4. EXPOSED SOIL AND STOCKPILES 7 DAYS 8. REPLACE, REPAIR OR SUPPLEMENT ALL NONFUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY FOLLOWING DISCOVERY
<br /> AND DOCUMENTED. UNLESS LISTED DIFFERENTLY BELOW:
<br /> A. REPAIR, REPLACE, OR SUPPLEMENT PERIMETER CONTROL DEVICES WHEN IT BECOMES NONFUNCTIONAL OR SEDIMENT
<br /> THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES IS AS FOLLOWS: SEDIMENT CONTROL PRACTICES (9.1 ) REACHES 1/2 THE HEIGHT OF THE DEVICE. COMPLETE REPAIRS BY THE END OF THE NEXT BUSINESS DAY FOLLOWING
<br /> 1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE 1. SILT FENCE AND ALL OTHER DOWN GRADIENT PERIMETER CONTROL DEVICES SHALL BE INSTALLED AND INSPECTED BY DISCOVERY.
<br /> 2. INSTALLATION OF SILT FENCE AROUND SITE THE CITY PRIOR TO ANY LAND DISTURBANCE ACTIVITY. B. REPAIR OR REPLACE INLET PROTECTION DEVICES WHEN THEY BECOME NONFUNCTIONAL OR SEDIMENT REACHES 1/2 THE
<br /> 3. INSTALL DOUBLE SILT FENCE AROUND WETLAND AREAS HEIGHT AND/OR DEPTH OF THE DEVICE.
<br /> 4. INSTALL ORANGE CONSTRUCTION FENCING AROUND INFILTRATION AREAS. 2. EROSION CONTROL BLANKET AND BIOROLLS SHALL BE PLACED WITHIN THE DITCH BOTTOMS WITHIN 24 HOURS AFTER C. DRAIN AND REMOVE SEDIMENT FROM TEMPORARY AND PERMANENT SEDIMENT BASINS ONCE THE SEDIMENT HAS REACHED
<br /> 5. CLEAR AND GRUB FOR TEMPORARY SEDIMENT BASIN/POND INSTALL. FINE GRADING. 1/2 THE STORAGE VOLUME. COMPLETE WORK WITHIN 72 HOURS OF DISCOVERY.
<br /> 6. CONSTRUCT TEMP PONDS - CAN USE PROPOSED BASINS AS TEMP PONDS D. REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS INCLUDING DRAINAGE WAYS, CATCH BASINS, AND
<br /> 7. CLEAR AND GRUB REMAINDER OF SITE 3. PRIOR TO STOCKPILING SOIL, SEDIMENT CONTROLS AT THE BASE OF THE STOCKPILE NED TO BE INSTALLED. OTHER DRAINAGE SYSTEMS. RESTABILIZE ANY AREAS THAT ARE DISTURBED BY SEDIMENT REMOVAL OPERATIONS.
<br /> 8. STRIP AND STOCKPILE TOPSOIL STOCKPILES LOCATED ON SITE SHALL BE SEEDED, MULCHED OR BLANKETED AND HAVE SILT FENCE OR A SEDIMENT REMOVAL AND STABILIZATION MUST BE COMPLETED WITHIN 7 DAYS OF DISCOVERY. PREPARE AND SUBMIT A
<br /> 9. ROUGH GRADING OF SITE BMP APPROVED BY THE ENGINEER IN THE FIELD PLACED AROUND THE BASE OF THE STOCKPILE. SITE MANAGEMENT PLAN FOR WORKING IN SURFACE WATERS. CONTACT ALL APPROPRIATE AUTHORITIES PRIOR TO
<br /> 10. STABILIZE DENUDED AREAS AND STOCKPILES WORKING IN SURFACE WATERS.
<br /> 11. INSTALL SANITARY SEWER, WATER MAIN, STORM SEWER AND SERVICES 4. MAINTAIN A 50-FOOT NATURAL BUFFER DOWN GRADIENT OF THE SITE OR REDUNDANT SEDIMENT CONTROLS IF E. REMOVE TRACKED SEDIMENT FROM PAVED SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF DISCOVERY. STREET
<br /> 12. INSTALL SILT FENCE/INLET PROTECTION AROUND CB'S BUFFER IS NOT FEASIBLE, WHEN THE CONSTRUCTION IS WITHIN 50 FEET OF A SURFACE WATER. SWEEPING MAY HAVE TO OCCUR MORE OFTEN TO MINIMIZE OFF SITE IMPACTS. LIGHTLY WET THE PAVEMENT PRIOR TO
<br /> 13. INSTALL STREET SECTION SWEEPING.
<br /> 14. INSTALL CURB AND GUTTER 5. MINIMIZE SOIL COMPACTION BY NOT DISTURBING AREAS OUTSIDE OF THE CONSTRUCTION LIMITS. DELINEATE AREAS F. MAINTAIN ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS GONE UNDER FINAL STABILIZATION, AND
<br /> 15. BITUMINOUS ON STREETS NOT TO BE DISTURBED PRIOR TO STARTING GROUND DISTURBING ACTIVITIES. PRESERVE ALL NATURAL BUFFERS THE NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED TO THE MPCA.
<br /> 16. INSTALL SMALL UTILITIES (GAS, ELECTRIC, PHONE, CABLE, ETC.) SHOWN ON THE PLANS. NO HEAVY CONSTRUCTION EQUIPMENT ALLOWED IN FILTRATION OR INFILTRATION AREAS PER
<br /> 17. FINAL GRADE BOULEVARD, INSTALL SEED AND MULCH PLANS.
<br /> 18. REMOVE ACCUMULATED SEDIMENT FROM BASIN/POND POLLUTION PREVENTION MANAGEMENT MEASURES (12.1 )
<br /> 19. FINAL GRAD POND/INFILTRATION BASINS (DO NOT COMPACT SOILS IN INFILTRATION AREAS.) 6. CONTRACTOR SHALL USE STREET SWEEPING IN ADDITION TO VEHICLE TRACKING BMPS IF THESE BMPS ALONE ARE ALL WORK NECESSARY TO PROVIDE PROPER POLLUTION PREVENTION MEASURES SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT.
<br /> 20. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR SODAANDSCAPING, REMOVE NOT ADEQUATE TO PREVENT SEDIMENT TRACKING ONTO THE STREET. 1. COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS, FLOATING DEBRIS, AND OTHER WASTE MUST BE DISPOSED OF
<br /> SILT FENCE AND RESEED AREAS DISTURBED BY THE REMOVAL. PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS.
<br /> 7. ANY SEDIMENT CONTROL PRACTICE USING SOIL IMPLEMENTED BY THE CONTRACTOR SHALL BE TEMPORARILY OR
<br /> ENVIRONMENTALLY SENSITIVE AREAS: PERMANENTLY STABILIZED WITHIN 24 HOURS OF INSTALLATION. 2. CONSTRUCTION MATERIALS NEED TO BE COVERED TO MINIMIZE STORMWATER INTERACTION UNLESS MATERIAL IS NOT A POTENTIAL
<br /> WETLANDS - THERE ARE NO/IMPACTS TO WETLANDS PER SECTION 22 OF THE PERMIT. SEE ATTACHED WETLAND PLAN FOR SOURCE OF STORMWATER CONTAMINATION.
<br /> IMPACTS AND MITIGATION. THE APPROVED WETLANDS PERMIT IS ON FILE WITH THE OWNER. 3. OIL, GASOLINE, PAINT AND ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT TO
<br /> SPECIAL AND IMPAIRED WATERS - TROTT BROOK IMPAIRMENT(S): BENTHIC MACROIN VERTEBRATES BIOASSESSMENTS; DISSOLVED PREVENT SPILLS, LEAKS OR OTHER DISCHARGES. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT
<br /> OXYGEN; FISH BIOASSESSMENTS; SULFATE VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA REGULATIONS.
<br /> TMDL - THERE ARE ESTABLISHED TMDL PLANS FOR TURBIDITY, FECAL COLIFORM, MERCURY IN FISH TISSUE, MERCURY IN WATER 4. EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES IS NOT ALLOWED ON SITE. RUNOFF MUST BE CONTAINED
<br /> COLUMN. AND WASTE PROPERLY DISPOSED OF. NO ENGINE DEGREASING IS ALLOWED ON SITE.
<br /> SCIENTIFIC OR NATURAL AREAS - THERE ARE NO SNA WITHIN 1 MILE OF THE PROJECT. EXPLAIN IF THERE IS. 5. ALL LIQUID AND SOLID WASTE GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF
<br /> CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY LINER THAT DOES NOT ALLOW WASHOUT LIQUIDS TO ENTER
<br /> THE GROUND WATER IS CONSIDERED AN IMPERMEABLE LINER. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND,
<br /> KARST AREA - THE PROJECT IS NOT LOCATED WITHIN A KARST AREA. AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTE MUST BE
<br /> CALCAREOUS FENS - THE PROJECT DOES NOT DISCHARGE TO A FEN. DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH
<br /> WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES.
<br /> P I 180- NEER en ineerin SEE FOLLOWING SHEET FOR CONTINUED SWPPP NOTES
<br /> 00-ENG-123074-SHEET-SWPPP
<br /> CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS
<br /> Revisions STORMWATER POLLUTION
<br /> 7am
<br /> hereby certify that this plan was prepared by Date LENNAR
<br /> HARMONY FARMS
<br /> (651)681-1914 Name /�LtQrlt. 1. 2024-02-05 City Comments LElV 1V Aim
<br /> 2422 Enterprise Drive e or under my direct supervision and that I
<br /> Mendota Heights,MN 55120 Fax: 681-9488 a duly Licensed Professional Engineer Brian N.Molinaro Designed 16305 36TH AVE.NO., SUITE 600 �� OF 30
<br /> www.plorieererig.COmder the laws of the State of Minnesota Reg.No. 47504 Date Drawn PREVENTION PLAN PLYMOUTH,MINNESOTA 55446 RAMSEY,MINNESOTA