My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/14/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 05/14/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:16:56 AM
Creation date
5/15/2024 11:00:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/14/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
drawings or schedules shall not relieve the Contractor from responsibility for deviation from Plans or <br /> Specifications, unless the Contractor has, in writing, called the Engineer's attention to such deviation <br /> at the time of submission, nor shall it relieve the Contractor from responsibility for errors of any sort <br /> in Shop Drawings or schedules. <br /> 4.4 Unless otherwise set forth in the Contract Documents or bidding documents, it shall be the <br /> Contractor's sole responsibility to determine subsoil conditions prior to the bidding of the job. If <br /> under the terms of the Contract Documents, the responsibility for subsoil conditions is with the <br /> Contractor, Contractor hereby represents that he has inspected the location or locations of the Work <br /> and has satisfied himself as to the condition thereof, including subsoil conditions, and that the <br /> Contract Price as set forth herein is just and reasonable compensation for all Work, including all <br /> foreseen or unforeseeable risks, hazards, and difficulties in connection therewith. <br /> 4.5 The Engineer will furnish and set stakes as may be necessary for the Contractor in order that <br /> the Contractor may construct the Work to the proper grade and alignment. <br /> 4.6 The Contractor shall carefully preserve benchmarks, reference points and stakes and, in case <br /> of willful or careless destruction, he shall be charged with the resulting expense and shall be <br /> responsible for any mistakes that may be caused by their unnecessary loss or disturbance. <br /> 4.7 The Engineer shall furnish such survey lines and grades as may be necessary for the proper <br /> control of the Work; but this shall not relieve the Contractor of responsibility for making careful and <br /> accurate measurements and for constructing the Work accurately to the lines furnished by the <br /> Engineer. The Contractor shall give the Engineer reasonable notice of his requirements for such <br /> survey lines and grade as the Contractor may require. <br /> 4.8 The Contractor shall furnish and place, as directed, all necessary guide boards and <br /> appurtenances and give such other incidental assistance at the Work site as may be required by the <br /> Engineer, for staking out the Work. The Contractor's working operations which interfere with the <br /> activities of the Engineer shall be temporarily suspended for such reasonable time as the Engineer <br /> may deem necessary. The Contractor shall carefully preserve the points furnished by the Engineer <br /> and shall receive no extra compensation for any materials or services furnished by the Contractor <br /> incidental to these operations of the Engineer. <br /> ARTICLE 5. Ownership and Copies of Documents, Record Documents and Security Thereof <br /> 5.1 All Specifications, Plans and copies thereof furnished by the Owner, through the Engineer, <br /> shall remain the Owner's property. They shall not be used on another project, and, with the exception <br /> of those sets which have been signed in connection with the execution of the Agreement, shall be <br /> returned to the Owner upon completion of the Project. <br /> 5.2 The Owner, through the Engineer, will furnish to the Contractor up to three (3) copies of the <br /> Specifications and Plans as are reasonably necessary for the execution of the Work. Additional <br /> copies will be furnished, upon request, at the cost of reproduction. <br /> GC 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.