My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/14/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 05/14/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:16:56 AM
Creation date
5/15/2024 11:00:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/14/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BITUMINOUS PAVEMENT PATCHING TECHNICAL SPECIFICATIONS <br /> 1. General <br /> This project shall generally consist of patching potholes by hand that are greater than 2 inches <br /> in depth on City streets identified on the attached project plan sheet, then skim patching the <br /> patched pavement. The Contractor shall conduct his work in conformance with the <br /> specifications set forth herein and in accordance with the Minnesota Department of <br /> Transportation Standard Specification for Construction, 2020 Edition, which is incorporated <br /> by reference to these specifications. In addition,the Contractor shall conduct the pavement <br /> patching operations in strict conformance with the material manufacturer's written <br /> instructions. <br /> 2. Materials <br /> Bituminous material for tack coat shall be C S S-1 h meeting MnD O T Specification 2357. <br /> Bituminous mixture for patching shall be Type SP 9.5 Bituminous Mixture for Patching (V2- <br /> inch minus) meeting MnDOT Specification 2231. <br /> 3. Equipment <br /> One-ton rubber-tired rollers shall be used to compact bituminous mixture for patching. Plate <br /> compacters may be used when a one-ton rubber-tired roller is unable to achieve compaction. <br /> 4. Pavement Patching Procedure <br /> First, potholes (pavement voids) greater than 2-inches in depth as measured from existing <br /> pavement surface shall be patched by hand prior to skim patching. This shall be accomplished <br /> by clearing all foreign matter, water and loosened particles from the pothole using compressed <br /> air. Once the pothole is clean and dry,C S S-1 h bituminous material for tack coat shall be evenly <br /> applied to bituminous surfaces within the pothole. After tack coat has been applied,the pothole <br /> shall be filled with bituminous mixture for patching and compacted in lifts not to exceed 3 <br /> inches to match existing pavement surface elevations. <br /> Next, the Contractor shall notify the City of Ramsey that streets are ready to be swept full- <br /> width to allow skim patching operations to commence. Skim patching operations shall consist <br /> of blowing all remaining debris and water off the surface of the street using compressed air. <br /> Tack coat shall then be applied evenly across the pavement at a rate of 0.05 gallons per square <br /> yard of pavement. The skim patch shall then be applied using one lift of bituminous mixture <br /> for patching applied to the bituminous pavement at an average depth of one-inch and an <br /> average width of 26-feet, 13-feet either side of centerline. The skim patch shall then be <br /> compacted. Traffic shall not be allowed on the patch until compaction is achieved. <br /> Once skim patching operations are complete, the Contractor shall notify the City that the street <br /> can be swept to remove residual debris. <br /> BPPTS 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.