My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/19/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 10/19/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:35:01 AM
Creation date
5/23/2024 10:46:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 7-1.Water Infrastructure Needed to Meet 2040 Demands and Estimated Costs. <br /> Item Quantitj16 Units 1h, Unit Cost Total Cost <br /> Rogers JIL "tho Nip <br /> 7 MGD Lime Softening WTP 1 Lump Sum $3050007000 $301000,000 <br /> Wells 1 Each $1,500,000 $1,500,000 <br /> Raw Watermain 103000 Feet $300 $3,000,000 <br /> Ramsey <br /> 12 MGD Lime Softening WTP 1 Lump Sum $403000,000 $405000,000 <br /> Wells 2 Each $1,500,000 $31 000,000 <br /> Raw Watermain 57000 Feet $300 $1,5007000 <br /> Dayton <br /> 2 MGD Lime Softening WTP 1 Lump Sum $155000,000 $155000,000 <br /> Wells 1 Each $17 500,000 $1,500,000 <br /> Raw Watermain 11000 Feet $300 $3,0007000 <br /> Corcoran <br /> 4 MGD Lime Softening WTP 1 Lump Sum $2050007000 $20,0001000 <br /> Wells 4 Each $1,500,000 $6,000,000 <br /> Raw Watermain 5,000 Feet $300 $1,500,000 <br /> jEasements/ Land 12 Acres $100 000 $1 200 000 <br /> Acquisitions ' <br /> Environmental 4 Miles $507000 $200,000 <br /> L Subtotal $126,300,000 <br /> EL Contingency (30%) $37,9001000 <br /> Eng/Admin/Legal (20%) $32,800,000 <br /> Total $1972000,000 <br /> 7.3 Ultimate Water Infrastructure <br /> The Northwest Metro communities will need to add additional infrastructure after 2040 to meet ultimate <br /> demands. Table 7-2 identifies the water infrastructure and estimated costs needed to meet ultimate <br /> demands. It should be noted that this infrastructure is in addition to what was included in Table 7-1. <br /> Page—32 1 METROPOLITAN COUNCIL <br />
The URL can be used to link to this page
Your browser does not support the video tag.