Laserfiche WebLink
5. 10. <br /> CC Regular Session <br /> Meeting Date: 05/28/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title <br /> Adopt Resolution#24-13 8 Ordering Request for Proposals for 2025 Capital Improvement Program projects <br /> topographic surveys, geotechnical services and utility testing <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-13 8 ordering request for proposals for 2025 Capital <br /> Improvement Program projects topographic surveys, geotechnical services and utility testing. <br /> Background: <br /> The current 2024 thru 2033 10-Year Capital Improvement Program(CIP)proposes street reconstructions of the <br /> following streets in 2025: <br /> •Fox Ridge Estates 1st&2nd subdivision <br /> o Design material for this subdivision were gathered in 2023,project design is currently underway. <br /> •MSA Sunwood Drive between Nowthen Boulevard(CSAH 5) and Erkium Street <br /> •MSA Alpine Drive between Sunfish Lake Boulevard(CR 57) and Saint Francis Boulevard(TH 47) <br /> o The CIP identifies two segments of Alpine Drive which are proposed to be combined into one project. <br /> •Dickenson Mississippi Estate subdivision <br /> •High Point subdivision <br /> o The CIP identified Section 22 Unplatted, which is proposed to be combined with the High Point <br /> subdivision project. <br /> • Sorteberg's subdivision <br /> The following streets are proposed to receive a pavement mill and overlay in 2025: <br /> •Beaudry's 2nd subdivision <br /> •Ramsey Town Center subdivision <br /> •Ramsey Town Center 2nd subdivision <br /> •Ramsey Town Center 4th subdivision <br /> •Ramsey Town Center 6th subdivision <br /> •Ramsey Town Center 7th subdivision <br /> •Ramsey Town Center IP 05-22 subdivision <br /> •Rum River Hills subdivision <br /> •Village of Sunfish Lake subdivision <br /> o Generally,pavement mill and overlay projects only require topographic survey of the pedestrian <br /> ramps for ADA upgrades. <br /> In total the 2024—2033 CIP proposes to reconstruct approximately 5.85 miles and overlay 4.38 miles of public <br /> roads in 2025. For comparison in 2024 the Pavement Management Program included 7.03 miles of <br /> reconstructions, and 5.76 miles of overlays, in addition to the 0.83 miles of streets included in the COR <br /> Infrastructure Improvements. <br />