My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 07/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:23:22 AM
Creation date
7/9/2024 2:22:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. 4. <br /> CC Regular Session <br /> Meeting Date: 07/09/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title: <br /> Adopt Resolution#24-181 Accepting Quotes and Awarding Contract for Improvement Project#24-56, Lift <br /> Station No. 1 Permanent Generator <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-181 accepting quotes and awarding a construction contract for <br /> Improvement Project#24-56, Lift Station No. 1 Permanent Generator. <br /> Background: <br /> The 2024—2033 Capital Improvement Program includes proposed project#24-SEW-002,Lift Station No. 1 <br /> Rehab and Generator,proposed for construction in 2025 at an estimated cost of$175,000. <br /> This project proposes to rehabilitate sanitary sewer Lift Station No. 1,which is located at 13659 - 137th Avenue, <br /> by replacing the original base elbows and forcemain,upsizing the pumps, and installing a permanent emergency <br /> power supply generator on site. This work will serve to replace deteriorating pipes and fittings,to accommodate <br /> increased sewage flowrates that have occurred since the lift station was constructed in 1990, and to prevent <br /> sewage from backing up into businesses and residences served by this and other lift stations during major power <br /> outages. <br /> During power outages, staff tows a portable generator on a trailer to this and other lift stations that don't have <br /> permanent generators. Staff pumps each station down,then disconnects the generator and moves to the next <br /> station, and repeats the process until power is restored. However, due to the constant and heavy sewage flowrates <br /> processed through this station, staff would not have the ability to disconnect the portable generator in the event of <br /> a long-term power outage, leaving other lift stations without power and possibly backing sewage up into <br /> neighboring homes and businesses. <br /> On April 9, 2024, City Council approved a proposal from Bolton&Menk, Inc. in the not-to-exceed amount of <br /> $26,400 to design the permanent emergency power supply generator and prepare plans and specifications for said <br /> improvements necessary to accommodate the permanent generator, apply for permits, administer the bid process, <br /> and provide construction related services. <br /> Pursuant to Ramsey City Council Resolution#24-159, adopted June 11, 2024,the City Council approved final <br /> plans and authorized requests for quotes. <br /> On June 28,20241 two (2) quotes were received, opened and tabulated, and the following quotes were found to <br /> comply with the approved plans and specifications and request for quotes. <br /> Contractor Total Quote <br /> Design Electric, Inc. $127,857.00 <br /> Killmer Electric, Inc. $171,349.00 <br /> Engineer's Estimate $90.935.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.