My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 07/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:23:22 AM
Creation date
7/9/2024 2:22:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Electric, Inc. submitted the lowest responsible quote in the amount of$127,857.00 for construction of the <br /> improvements in accordance with the approved plans and specifications and request for quotes. <br /> Notification: <br /> Notifications are not required for this case. <br /> Time Frame/Observations/Alternatives: <br /> Observations: <br /> Lift Station No. 1 is not the largest lift station in Ramsey but it is the busiest, as well as the oldest, and it averages <br /> 60 starts per day. The purpose of this project is to improve the reliability of this lift station. <br /> A second project is proposed for 2025, or possibly the Fall of 2024, to further improve the reliability, and the <br /> productivity, of this lift station by making internal improvements per the adopted 2024—2033 CIP sheet for <br /> project#24-SEW-002,Lift Station No. 1 Rehab and Generator. <br /> No significant SCADA changes were determined to be needed as a result of these improvements, and a sound <br /> study was not completed for the generator improvements at this site. <br /> Alternatives: <br /> Alternative#1: Motion to adopt Resolution#24-181 accepting quotes and awarding a construction contract to <br /> Design Electric, Inc. in the amount of$127,857.00 for Improvement Project#24-56,Lift Station No. 1 Permanent <br /> Generator. <br /> Alternative#2 -Motion to deny adoption of Resolution#24-181 at this time. <br /> Funding Source: <br /> The engineer's estimated construction cost for the proposed improvements was $90,93 5.00. <br /> Design Electric, Inc. submitted the low quote in the amount of$127,857.00. The higher bid price is due <br /> primarily to the steady increase in generator prices over the last few years. While this project could be re-bid at a <br /> later date,the expectation is that generator prices will continue to rise and the City would not likely realize a cost <br /> savings by re-bidding this project. <br /> Funding for this project, including costs for contracted design and construction related services, is proposed to <br /> come from sanitary sewer enterprise funds. <br /> Recommendation: <br /> Staff recommends approving alternative#1 for reasons noted herein. <br /> Outcome/Action: <br /> Motion to adopt Resolution#24-181 accepting quotes and awarding a construction contract to Design Electric, <br /> Inc. in the amount of$127,857.00 for Improvement Project#24-56, Lift Station No. I Permanent Generator. <br /> Attachments <br /> Resolution 24-181 <br /> CIP 24-SEW-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.