BASIS OF PAYMENT: <br />Mobilization — Payment shall be made on a lump sum basis for the mobilization of equipment. <br />6" Ductile Iron Pipe Class 53 Watermain — Payment shall be made on a per lineal foot basis as <br />compensation for all equipment, material, and labor costs required for the installation of DIP <br />watermain. Excavation for watermain is incidental to the DIP Watermain pay item. Installation of <br />ductile iron fittings, including but not limited to all bends, restraints, caps are incidental. <br />Salvage & Install Hydrant — Payment shall be made on a per each basis as compensation for all <br />equipment, material, and labor costs required to salvage and installation of hydrants to the location <br />shown on the exhibit. <br />Gate Valve & Box — Payment shall be made on a per each basis as compensation for all equipment, <br />material, and labor costs required for installing gate valves and box, based upon size. <br />Sanitary Sewer Pipe — Payment shall be made on a per lineal foot basis as compensation for all <br />equipment, material, and labor costs required for the installation of PVC sanitary sewer based upon <br />size and type. Excavation as required to install the sanitary sewer is incidental to the pay item, <br />except within drain field, which shall be paid by the excavate and dispose pay item. <br />4 " Sanitary Cleanout — Payment shall be made on a per each basis as compensation for all <br />equipment, material, and labor costs required for the installation and connection of sanitary sewer <br />cleanout. Final heights adjustments to grade are incidental to the pay item. <br />8 "x4 " Sanitary Sewer Reducer — Payment shall be made on a per each basis as compensation for <br />all equipment, material, and labor costs required for connection to the existing sanitary sewer line <br />with an 8"x4" PVC reducer. <br />Clean and Remove Concrete Septic Tank — Payment shall be made on a lump sum basis as <br />compensation for all equipment, material, and labor costs to cleanout and remove concrete septic <br />tank. <br />Excavate and Dispose Drain Field Material — Payment shall be made on a per cubic foot basis as <br />compensation for all equipment, material, and labor costs required to excavate, load, haul and <br />properly dispose of excavated drain field material. Backfill of excavated material with clean fill is <br />incidental to the pay item. <br />Irrigation Repair — Payment shall be made on a lump sum basis as compensation for restoring <br />irrigation components damaged as a result of construction. <br />Restoration — Payment shall be made on a per acre basis as compensation for restoring the <br />excavation area with a minimum of 4" topsoil, seed, fertilizer, and hydro -mulch. Seed mix shall <br />meet MnDOT seed mixture 25-151. <br />Other Items — The cost of any additional equipment, labor, materials, tools and supplies which <br />have not been specifically identified in this section for payment, but are required to complete the <br />project per the plans and specifications shall be considered incidental to the project. <br />