My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 07/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:47:31 AM
Creation date
7/15/2024 1:32:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESCRIPTION OF WORK <br /> SUMMARY <br /> This project consists of trail pavement rehabilitation intended to improve the serviceability <br /> and ride quality of the shared multi-use paved trail along west County Road 75 between <br /> Washington Avenue and Meadow Oak Avenue and along County Road 18 between CSAH 75 <br /> and I-94 to (see enclosed map of the project area). The trail segment identified for Work <br /> has experienced surface deficiencies primarily in the form of surface cracking and minor to <br /> major raveling. The trail pavement will require crack filing, asphalt removal and patching or <br /> infrared patching, and T-Mat installation. An alternate quote shall be provided for the crack <br /> filling and asphalt patching work. <br /> The trail segment is a component of the City of Monticello paved trail system, a heavily- <br /> used route for trail users of all recreation types: walking/hiking/running, dog-walking, <br /> biking, rollerblading, commuting, and roller skiing. For these reasons, the Contractor must <br /> pay careful attention to the requirements for safety, maintenance of traffic, and approved <br /> work times, as referenced throughout the Contract Documents. <br /> To maintain heavy trail traffic during the summer months, the Contractor will be required to <br /> place T-Mat in specific trail Segments, allowing trail to fully dry prior to moving onto next <br /> Segment. The contractor shall only close the trail segment that is actively being worked on. <br /> The contractor shall submit to the City a schedule of the intended closure dates of the trail <br /> segments one week prior to commencing work to allow the City to properly notify the <br /> public. <br /> The contractor shall not change the dates of closure once submitted (excluding delays due <br /> to weather related events). The contractor shall install temporary construction signage as <br /> necessary and as determined by the City. No substitutions will be allowed. <br /> PRESERVATION OF EXISTING FEATURES <br /> The Contractor shall minimize disruption and damages to existing Project Site features, <br /> including but not limited to lawns, trees, existing topography, pavements, and curbing. All <br /> construction access and traffic shall be confined to the routes indicated on the Drawings or <br /> by the project Engineer. Any damages to Project Site features outside the specified routes <br /> shall be repaired and restored by the Contractor to the satisfaction of the City of Monticello <br /> at no cost to the City of Monticello. <br /> The Contractor and City of Monticello shall create a photo inventory of pre-construction <br /> conditions of the Project Site for later use in determination of changed conditions. <br /> END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.