My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 07/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:47:31 AM
Creation date
7/15/2024 1:32:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Receive approval to proceed from City of Monticello Representative. <br /> 3.2 PREPARATION <br /> A. Apply Acrylic Adhesion Promoter to all heavily shaded areas and as directed <br /> by the City of Monticello Representative, per manufacturer recommendations. <br /> 3.3 PERFORMANCE <br /> A. Conduct work in phases to meet the requirements of Part 1.2.D.2. Install <br /> appropriate traffic control devices and move the devices as necessary during <br /> each phase. <br /> B. Apply two coats, uniform coat of T-MAT to the full trail width, per <br /> manufacturer recommendations. Do not allow product to spill over the trail <br /> edge or to pool on the trail surface. <br /> C. Coverage rate shall be at least 0.50 gallons per square yard. <br /> D. Speed of distribution vehicle shall be sufficiently slow, to ensure optimal <br /> adhesion of the product. <br /> E. Traffic control devices shall remain in-place until the finished surface has fully <br /> cured, dried, and can be opened to traffic without risk of damage to the work. <br /> 3.4 CLEAN UP AND DISPOSAL <br /> A. In the event of overspill of the product during installation, confine the product <br /> to the trail shoulder and prevent any flow towards surface waters or wetlands. <br /> Allow product to dry, and then return to clean up and dispose of the product. <br /> Overspill material shall be considered excess product. <br /> B. In the event of pooling of the product during installation, use a squeegee or <br /> similar to spread the product uniformly across the surrounding trail surface, <br /> provided that the resultant product thickness will cure and dry at the same <br /> rate as surrounding areas. If the resultant product thickness will not cure and <br /> dry at a reasonable rate, or at the direction of the City of Monticello <br /> Representative, spread the product off of the trail edge, and treat it as <br /> overspill material. <br /> C. Remove and properly dispose of all work-related debris and excess product <br /> off site in accordance with local and state regulations. <br /> D. Material beyond the edge of paved trail must be allowed to cure and dry, and <br /> then be cleanly detached from the adjacent pavement surface and properly <br /> disposed of off-site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.