Laserfiche WebLink
Sieve Size % Passing <br /> #4 100 <br /> #8 100 <br /> #16 99 <br /> #30 91 <br /> #50 56 <br /> #100 30 <br /> #200 12.7 <br /> 2.3 EQUIPMENT <br /> A. All equipment shall be certified for T-MAT installation by the manufacturer. <br /> B. Distributor vehicle shall be self-propelled, rubber-tired, suitable for trail use, <br /> and capable of applying the product across the full width of the trail in a <br /> single pass. <br /> C. Distributor vehicle tank capacity shall not exceed 500 gallons. Not greater <br /> than 300 gallons of product shall be present in the tank at any time. <br /> D. Feeder vehicle shall be properly sized and loaded to travel to designated <br /> access points without risking damage to park infrastructure. <br /> 2.4 TRAFFIC CONTROL DEVICES <br /> A. Conform to devices prescribed by the MMUTCD, or approved equal. <br /> B. Survey ribbon, lathe, or rope shall not be acceptable traffic control devices. <br /> C. Acceptable traffic control devices include MUTCD sign panels installed on Type <br /> III barricades and/or portable fencing panels, and approved equals. <br /> PART 3 - EXECUTION <br /> 3.1 EXAMINATION <br /> A. The Contractor shall coordinate a site meeting with the City of Monticello <br /> Representative prior to commencing construction activities to generally review <br /> the scope of work and to ensure that the requirements of Part 1.2.D are <br /> acceptable. <br /> B. Conduct work only if the surface has been cleaned and prepared per Section 1 <br /> - Clean and Prepare Trail Surface. <br />