Laserfiche WebLink
DESCRIPTION OF WORK <br /> SUMMARY <br /> This project consists of trail pavement rehabilitation intended to improve the serviceability <br /> and ride quality of the shared multi-use paved trail within the Meadow Oak development. (see <br /> enclosed map of the project area). The trail segment identified for Work has experienced <br /> surface deficiencies primarily in the form of surface cracking and minor to major raveling. The <br /> trail pavement will require crack filing, asphalt removal and patching or infrared patching, <br /> and RoadGuard installation. An alternate quote shall be provided for the crack filling and <br /> asphalt patching work. <br /> The trail segment is a component of the City of Monticello paved trail system, a heavily-used <br /> route for trail users of all recreation types: walking/hiking/running, dog-walking, biking, <br /> rollerblading, commuting, and roller skiing. For these reasons, the Contractor must pay <br /> careful attention to the requirements for safety, maintenance of traffic, and approved work <br /> times, as referenced throughout the Contract Documents. <br /> To maintain heavy trail traffic during the summer months, the Contractor will be required to <br /> place RoadGuard in specific trail Segments, allowing trail to fully dry prior to moving onto <br /> next Segment. The contractor shall only close the trail segment that is actively being <br /> worked on. <br /> The contractor shall submit to the City a schedule of the intended closure dates of the trail <br /> segments one week prior to commencing work to allow the City to properly notify the <br /> public. <br /> The contractor shall not change the dates of closure once submitted (excluding delays due <br /> to weather related events). The contractor shall install temporary construction signage as <br /> necessary and as determined by the City. No substitutions will be allowed. <br /> PRESERVATION OF EXISTING FEATURES <br /> The Contractor shall minimize disruption and damages to existing Project Site features, <br /> including but not limited to lawns, trees, existing topography, pavements, and curbing. All <br /> construction access and traffic shall be confined to the routes indicated on the Drawings or <br /> by the project Engineer. Any damages to Project Site features outside the specified routes <br /> shall be repaired and restored by the Contractor to the satisfaction of the City of Monticello <br /> at no cost to the City of Monticello. <br /> The Contractor and City of Monticello shall create a photo inventory of pre-construction <br /> conditions of the Project Site for later use in determination of changed conditions. <br /> END OF SECTION <br /> F:WDMIN\WORDPROC\PARKS DEPT\PATHWAY MAINTENANCE PROGRAM(PMP)\MAINTENANCE\2018\PATHWAY REHAB ROADGUARD SPECS-2018.DOCX Page 1 <br />