Laserfiche WebLink
AREA OF REPAIR <br /> COMPLETELY REMOVE ALL <br /> CONTAMINANTS <br /> FROM TRAIL SECTION. <br /> 1 <br /> I <br /> r /fi /f �/��f� f//�f�f/r///• <br /> -III III III III f fi/ <br /> NOTES: SAWCUT ROOTS <br /> 1. SAWICUT BITUMINOUS PAVEMENT FULL WIDTH BETWEEN REPAIR EXTENTS. CLEANLY TO <br /> 2. REMOVE BITUMINOUS PAVEMENT AND CONTAMINATED BASE MATERIAL. DEPTH OF 19' <br /> 3. SAW CUT TREE ROOTS 2'FROM TRAIL EDGE,MIN.INSTALL ROOT BARRIER AS MIN. <br /> DIRECTED BY ENGINEER/CONTRACT DOCUMENTS. (SEE DETAIL GEN-4). <br /> 4. RECOMPACT SUBGRADE. <br /> 5. PLACE AND COMPACT CL5 AGGREGATE BASE.PER Mn DOT SPEC 2211. <br /> 6. PLACE AND COMPACT BITUMINOUS MAT,SPWEA240B WITH VIBRATORY ROLLER <br /> EQUIPMENT THAT IS PROPERLY SIZED,AS TO NOT CAUSE ANY DAMAGE TO <br /> ADJACENT TRAILS PER MnDOT SPEC 2360. <br /> 7. SHOULDER WITH TOPSOIL(AMENDED AND LOOSENED),RESTORE SEED <br /> (MnDOT 25-141)AND MULCH OR BLANKET AS DIRECTED BY OWNER <br /> AND PER MnDOT SPEC 2572. <br /> 8. DETAIL REFLECTS ACCEPTABLE MEANS AND METHODS. CONTRACTOR MAY SUBMIT <br /> ALTERNATIVE MEANS AND METHODS TO OWNER FOR REVIEW AND APPROVAL. <br /> 9. ALL CONSTRUCTION RELATED DEBRIS,VEGETATION AND CONTAMINATED SOILS <br /> SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF. <br /> rT R-1 o TRAIL REPAIR -TREE ROOT DAMAGE <br /> NTS <br /> CAUSERSTEBRA MUSGROVE\DOWNLOADS\PATHWAY MIRCO-SURFACING-2020 MPL.DOCX Page 16 <br />