My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 07/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:47:31 AM
Creation date
7/15/2024 1:32:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 1. <br /> Public Works Committee <br /> Meeting Date: 07/16/2024 <br /> Primary Strategic Plan Initiative: Not Applicable <br /> Title: <br /> Receive Updates on Wetland 114P <br /> Purpose/Background: <br /> See attached June 18, 2024,meeting minutes for detailed background information. <br /> Since the June 18th Public Works Committee meeting, the following tasks have been completed. <br /> •The draft PWC meeting minutes provided by Timesavers were edited by comparing the minutes to the <br /> audio recording to ensure the minutes accurately capture the attending resident's names, addresses, <br /> comments and requests. The edited minutes are included under section 4 for Committee approval. <br /> •The outlet control structure for wetland 114P was surveyed to confirm as-built elevations. Based on the <br /> as-built elevation,which was verified independently,the weir in the outlet control structure was constructed <br /> to an elevation of 858.57 feet,which is 8-inches higher than the elevation shown in the approved <br /> construction plans of 857.9. Staff is therefore working to temporarily sawcut the weir to lower the outlet <br /> elevation to 857.9, and is exploring options to permanently reconstruct or reinstall the outlet control <br /> structure this Summer or Fall. <br /> •Lot surveys for the properties of residents that called with high-water concerns and/or that attended June's <br /> PWC meeting were located and reviewed against the approved and as-built outlet elevations to determine <br /> the extent to which yards may be prone to extended periods of standing water, and to determine a revised <br /> outlet elevation that would allow yards to drain more fully following heavy and/or prolonged rain events. <br /> The lowest lot corner elevations for these properties range between 856.0 and 859.0,which means some <br /> lots will have standing water over portions of them throughout the year during wet years. The low floor <br /> elevations for these properties range between 861.0 and 865.8,meaning the water would need to overflow <br /> the existing weir by almost 2.5 feet to flood any of the structures, and by almost 3.25 feet once the weir is <br /> lowered to the approved plan elevation. <br /> • Staff reviewed plats to document wetland boundaries and drainage easements on properties surrounding <br /> wetland 114P. Copies of the plats are attached to the case. <br /> • Staff gathered requested documentation proving that the DNR required the City to construct an outlet <br /> control structure to raise the surface water elevation of wetland 114P. This email is attached to this case. <br /> • Staff shared the resident's concerns with our DNR representative, Wes Saunders-Pearce, and is having <br /> additional conversations to determine if the DNR will agree to reducing the outlet elevation further to <br /> prevent extended periods of standing water on private properties. <br /> • Staff continues to monitor the water elevation in wetland 114P. As of July 11 th, the water elevation was <br /> approximately 1-inch above the top of the weir. <br /> Notification: <br /> N/A <br /> Time Frame/Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.