Laserfiche WebLink
Staff anticipates 30 minutes will be required to present this case and respond to questions. <br /> Observations: <br /> On Friday,July 12th, approximately 8-inches was removed from the top of the concrete weir within the outlet control <br /> structure for Wetland 114P to lower the weir elevation from 858.57 to 857.84. <br /> Funding Source: <br /> Any costs associated with this case will be paid through Stormwater Funds. <br /> Recommendation: <br /> Staff is working to saw-cut the weir to lower it 8-inches to the approved DNR elevation as quickly as possible, <br /> and will present additional updates during the August PWC meeting, including potential plans to permanently <br /> reconstruct or reinstall the outlet control structure based on additional DNR input. <br /> Outcome/Action: <br /> No action is requested at this time. <br /> Attachments <br /> Wetland 114P w NWI layer <br /> Plat Chestnut Hills 2nd Addn <br /> Plat Chestnut Hill 3rd Addn <br /> Plat Chestnut Hill 4th Addn <br /> Plat Chestnut Hill <br /> Plat Chestnut Ridge <br /> Plat Chestnut Ridge 2nd Addn <br /> Plat Chestnut Woods <br /> Plat Ramsey Terrace <br /> Plat Ponds of Ramsey 2nd Addn <br /> Plat Ponds of Ramsey <br /> Plat Windemere Woods <br /> Plat Wood Pond Hills <br /> Plat Wood Pond Hills 3rd Addn <br /> Plat Wood Pond Hills 4th Addn <br /> DNR email <br /> Form Review <br /> Inbox Reviewed By Date <br /> Brian Hagen Bruce Westby 07/11/2024 11:38 AM <br /> Bruce Westby(Originator) Kathy Schmitz 07/11/2024 02:49 PM <br /> Brian Hagen Brian Hagen 07/11/2024 03:28 PM <br /> Form Started By:Bruce Westby Started On:07/10/2024 10:17 AM <br /> Final Approval Date:07/11/2024 <br />