Laserfiche WebLink
into the property. No excavation or pavement reconstruction will be needed, as there is sufficient pavement width <br />to accommodate the new turn lane. The Applicant has been working with Anoka County on the re-strie design. <br />Minimum parking requirements for assembly uses, including religious institutions, are one space for each three <br />seats of design capacity. The building's main assembly space is designed for 500 occupants, which results in a <br />minimum parking requirement of 167 stalls. The Applicant is proposing to construct 261 stalls, which exceeds the <br />minimum requirement by 56.29 percent (94 stalls) and exceeds the maximum allowable parking supply by 41.85 <br />percent (77 stalls), but the Applicant stated the need for additional stalls to meet the parking demand of the <br />proposed development, based on their current operations in Ham Lake. In addition to the 261 parking stalls, the <br />Applicant is proposing a paved drop-off area in front of the main entrance. There are no on -street overflow <br />parking opportunities. <br />Pedestrian access to the site will come from a shared -use trail along the west side of Armstrong Boulevard. A new <br />sidewalk will be built to connect the building's main entrance to this shared -use trail. Other sidewalks will <br />encircle most of the building to provide access from the parking lot to each of the building's entrances, as required <br />by the Minnesota State Building Code. <br />Landscape Plan <br />As noted in the Environmental Policy Board's (EPB) staff report from July 15th, the Landscape Plan is generally <br />acceptable. However, Staff did note various minor corrections that are needed (see attached Landscape Plan). <br />Staff has suggested adding some taller growing evergreen shrubs in between the deciduous trees along the north <br />side of the parking lot. These additional plantings will aid with shielding headlight glare into the abutting <br />residential property. Staff has also requested a 3-5 year maintenance plan for the area proposed to be established <br />with a native seed mix. Having a maintenance plan will be beneficial for the property owner in ensuring that the <br />seed mix not only gets established but in preventing unwanted vegetation (weeds) from taking over the area. <br />Irrigation is not proposed (nor is it required). However, turf establishment is proposed to be accomplished <br />through seeding. Staff has requested more information on how the areas seeded will be watered to ensure <br />germination and establishment of turf. <br />Utilities <br />The building will be connected to municipal water through a service line that will connect to an existing valve at <br />the northeast comer of the site. Since sanitary sewer is unavailable to the site, as it is outside the MUSA, the <br />building will use a septic system to handle sewer needs. <br />Storm Water Management <br />There will be an on -site storm water management basin constructed southwest of the parking lot to handle runoff <br />from the entire site. The stormwater plan will require Lower Rum River WMO review. <br />Preliminary Plat <br />The Subject Property is currently unplatted. To accommodate the proposed development, a preliminary plat is <br />needed to ensure the proposed site improvements will fit within the proposed lot. The proposed subdivision would <br />create two parcels: an 8.93-acre parcel (Lot 1, Block 1) to accommodate the proposed church development, and a <br />0.47-acre outlot to be deeded to the City for future trail development along the Lake Itasca corridor, satisfying a <br />portion of the park dedication requirements. Additionally, there would be right-of-way dedication for the south <br />half of future 157th Avenue NW at the northeast corner of the subdivision. By dedicating the 33-foot-wide <br />section for 157th Avenue NW, the right-of-way is preserved for its eventual connection to Eland Street to the <br />north. The Nordvik Addition, which directly abuts the Subject Property to the north, planned for the eventual <br />replatting of property within the Nordvik Addition, which would then require the Eland Street right-of-way to <br />extend south through the site to serve all newly -created lots. The 157th Avenue extension would then serve as the <br />southern connection of Eland Street to provide neighborhood connectivity, which would improve public safety <br />and street maintenance routes. <br />Due to the specialized nature of each of the uses and buildings within the P/I zoning district, no bulk standards <br />exist, as noted in Section 106-830 of City Code. That being said, the proposed development seems to be in general <br />