Laserfiche WebLink
SEH <br />Building a Better World <br />for All of Use <br />City of Ramsey <br />OWNER <br />21-08 <br />OWNER'S PROJECT NO. <br />Water Treatment Plant Trunk Water Main Improvements <br />PROJECT DESCRIPTION <br />The following changes shall be made to the contract documents: <br />Description: <br />Increase: <br />Item <br />51 <br />53 <br />58 <br />71 <br />Description <br />HYDRANT <br />6" GATE VALVE AND BOX <br />6" DIP WATER MAIN CL 53 <br />DUCTILE IRON FITTINGS <br />Qty Unit <br />1 EACH <br />1 EACH <br />20 LF <br />395 LBS <br />Reduce: <br />65 20" DR 18 FUSIBLE PVC WATER MAIN (HDD) <br />(RAW WATER) 130 LF <br />Add: <br />20" BUTTERFLY VALVE <br />6" CONCRETE WALK <br />TRUNCATED DOME <br />Additional Item discussed in Field: <br />15 AGGREGATE BASE CLASS 5 (MODIFIED) 5,512 TON <br />CHANGE ORDER 2 TOTAL <br />1 EACH <br />400 SF <br />10 SF <br />CHANGE ORDER <br />July 2, 2024 <br />DATE <br />2 <br />CHANGE ORDER NO. <br />RAMSY 174498 71.50 <br />SEH FILE NO. <br />Unit Price Cost <br />$7,000.00 $7,000.00 <br />$2,420.60 $2,420.60 <br />$96.78 $1,935.60 <br />$12.78 $5,048.10 <br />$249.13 ($32,386.90) <br />$17,100.63 <br />$18.33 <br />$81.58 <br />$17,100.63 <br />$7,332.00 <br />$815.80 <br />$24.01 $132, 343.10 <br />$141,608.93 <br />Purpose of Change Order: <br />During the project, discussions were held between the City and County on the challenges of directional drilling <br />across Ramsey Bldv to tie into the existing water main on the west side. Specifically as it pertained to keeping all <br />traffic lanes open around the drilling pits. The decision was made jointly with the City and County to eliminate this <br />portion of the project with Ramsey Blvd County right-of-way and have the County install the water main crossing <br />with their project. <br />Because the 20" fused PVC pipe could not be restocked, the City will be reimbursing the Contractor for materials <br />only but not the labor to install it. This represents an approximate 50% savings in the HDD unit price. <br />The other component of the project was to revise the street design to make it a full depth reconstruction and build <br />it back to a 9 ton street, rather than the original design to simply mill and overlay the 7 ton street (at the City's <br />request). <br />The attached plan sheet shows the changes at the 143rd/Ramsey Blvd intersection. It did require some <br />additional water main elements to make this change, such as hydrant, valves, fittings, etc. <br />The road reconstruction work has not started yet as they are still installing the water main pipe. <br />Engineers I Architects I Planners I Scientists <br />Short Elliott Hendrickson Inc., 10650 Red Circle Drive, Suite 500, Minnetonka, MN 55343-9229 <br />952.912.2600 1800.734.6757 1888.908.8166 fax I sehinc.com <br />SEH is 100% employee -owned I Affirmative Action —Equal Opportunity Employer <br />