My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 08/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:27:26 AM
Creation date
8/9/2024 8:32:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOIL BORING LOG REQUIREMENTS: A field boring log will be prepared by the Contractor for each boring <br />with a copy included in the final report. The field boring logs will include; <br />• The project identification number <br />• Location of the boring referenced by centerline stationing <br />• Boring log number <br />• Method of drilling and sampling, diameter of bore hole <br />• Date, name of driller and crew <br />• Ground surface elevation and ground water elevation measured to the nearest 0.5 feet <br />• Definition of all symbols that are not otherwise self-explanatory <br />• Classification, thickness, color, moisture condition (dry, moist, wet, saturated), composition and degree <br />of compactness <br />• Field number of any samples taken, type of sample and depth taken <br />• Depth at which obstacles were encountered in advancing the boring <br />• Any other unusual conditions encountered during drilling and sampling <br />SCHEDULE: A written schedule of the work shall be submitted identifying all work components and showing <br />work start and completion dates required to comply with the schedule. Once work has commenced, the Contractor <br />shall continuously pursue completion in accordance with the approved schedule. The final Geotechnical Reports <br />must be delivered to the City by Friday, November 1, 2024. <br />PROPOSAL SUBMITTAL: An itemized quote shall be submitted for the proposed work using the form at the <br />end of this Request for Proposal (RFP). <br />COMMUNICATION WITH THE CITY: If any requirements of this RFP are not clearly understood, the <br />Contractor is responsible for contacting the City for further clarification in a prompt manner. Responses to <br />inquiries, if they change or clarify the RFP in a substantial manner, will be forwarded by addenda to the RFP. <br />SUBMISSION: A signed copy of the attached proposal form is requested by 4:00 P.M. Tuesday, August 6, <br />2024. Deliver to the Ramsey Municipal Center, 7550 Sunwood Drive NW, Ramsey MN 55303 to the attention <br />of Stacie Damjanovich, Engineering Administrative Assistant. E-mail quotes will be accepted and may be sent to <br />SDamj anovich@cityoframsey.com. <br />PROPOSAL UNDERSTANDING: By submitting a proposal, the Contractor agrees to be bound to the terms <br />and conditions herein. <br />COSTS OF PREPARATION: Under no condition will any costs of preparation of the proposal be reimbursed <br />by the City. <br />LICENSE AND INSURANCE: By submitting a proposal, the Contractor affirms they shall maintain the <br />following minimum insurance coverage while completing their work as related to this RFP in the following <br />amounts: Commercial General Liability $1,000,000 per occurrence (written on an occurrence based form bodily <br />injury and property damage); automobile liability $1,000,000 per occurrence (including hired & non -owned <br />bodily injury and property damage). The City of Ramsey shall be named as an additional insured on the <br />Commercial General Liability insurance. Certificates of Insurance for all of the above insurance shall be filed <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.