Laserfiche WebLink
5. IP 25-06 Sorteberg's Street Reconstructions <br />a. Subdivision is generally located along 159th Lane and Xenolith Street <br />i. Street are approximately 0.54 miles in total length <br />1. 31-feet wide, urban section with bituminous curb <br />2. No municipal utilities exist or are proposed <br />ii. Scope of work includes: <br />1. Eight (8) soil borings to a depth of 10-feet per the attached exhibit <br />2. Seven (7) pavement cores <br />iii. A standard geotechnical report including construction feasibility for public utilities and <br />pavement section <br />1. Streets require a 7-ton pavement design <br />a. Typically, City would do an FDR or full reconstruction <br />2. Logs of soil borings with descriptions of nomenclature used for defining the site <br />soils <br />3. Estimated subgrade support strength parameters for design of the bituminous <br />roadway and recommendations for soil corrections; Design R-Value estimate <br />4. Recommendations for earthwork associated with installation of storm sewer pipes <br />and structures <br />a. Considerations for infiltration rate within low area at 16021 Xenolith Street <br />5. Recommendations for management of groundwater for design of structures and <br />pavements <br />6. 2024 Gravel Roads <br />a. Six (6) gravel roads located across the City <br />i. Streets are approximately 1.90 miles in total length <br />ii. Typically, 24-foot wide rural section <br />b. Scope of work includes: <br />i. Twenty-four (24) soil borings to a depth of 10-feet per the attached exhibit <br />c. A standard geotechnical report including construction feasibility for shallow storm sewer <br />construction and pavement section <br />i. Streets require a 7-ton pavement design <br />1. Typical City Street section is 3.5-inch bituminous over 4 to 6-inch class 5 <br />ii. Logs of soil borings with descriptions of nomenclature used for defining the site soils <br />iii. Estimated subgrade support strength parameters for design of the bituminous roadway and <br />recommendations for any soil corrections; Design R-Value estimate <br />iv. Recommendations for earthwork associated with installation of storm sewer pipes and <br />structures <br />v. Recommendations for management of groundwater for design of structures and pavements <br />SOIL BORING REQUIREMENTS: Soil borings to a depth called out above will be taken at stationing shown <br />on the attached "Boring Hole Location" exhibits. Soil borings will alternate between drive lanes as practical. <br />Cores of the existing bituminous pavement will be required. Cores will be taken to verify thickness and structural <br />integrity of the existing pavement and base. Pictures of the cores will be included in the final report. Any <br />additional depth beyond depth called out will be paid per lineal foot. The Contractor must perform sufficient <br />survey work to locate holes approximately 5 feet horizontally and approximately 0.5 feet vertically. The <br />Contractor is responsible for locating all utilities prior to starting boring operations. <br />4 <br />