My WebLink
|
Help
|
About
|
Sign Out
Home
Resolution - #94-02-019 - 02/08/1994
Ramsey
>
Public
>
Resolutions
>
1994
>
Resolution - #94-02-019 - 02/08/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 10:54:06 AM
Creation date
8/13/2024 3:30:28 PM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Resolutions
Resolution or Ordinance Number
#94-02-019
Document Date
02/08/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8) <br /> <br />9) <br /> <br />lO) <br /> <br />11) <br /> <br />12) <br /> <br />13) <br /> <br />That the equipment housed in the structure includes two process modules, fuel cell <br />stack, start-up heater, start-up skid, load bank, LFG cleanup system, Data <br />acquisition system and control room. The equipment will utilize the landfill gas <br />currently generated by the landf'fll to demonstrate the potential use in generating <br />electricity. The equipment has redundant safety features including automatic shut- <br />down procedures. <br /> <br />The test facility will also include two (2) temporary mobile structures to provide <br />office and bathroom facilities for project personnel. <br /> <br />That the Applicant has indicated that at the conclusion of the test demonstration, the <br />structure will be removed from the Site and the equipment will be transported to <br />another project site not within the City limits. <br /> <br />That the Applicant has indicated that zero residue from the test operations will <br />remain on the Site; that all by-products are shipped out of state. <br /> <br />That the Applicant has stated that no State or County permits are required for thc <br />test demonstration facility. <br /> <br />That the permit being sought is for a period of one (1) year to accommodate site set- <br />up, 4,000 hours of demonstration testing and site teardown. <br /> <br />14) That the property south and west of the Site is zoned Industrial and Residential to <br /> the north and east. <br /> <br />16) <br /> <br />17) <br /> <br />18) <br /> <br />19) <br /> <br />20) <br /> <br />That the test demonstration facility is proposed to be located approximately 500 feet <br />from the nearest residential dwelling. <br /> <br />That materials and supplies required to support the demonstration will be delivered <br />by truck to the Site utilizing the existing landfill entrance off Sunfish Lake Blvd. <br />N.W. <br /> <br />That the Applicant has indicated that the test demonstration facility will be a 24 hour <br />a day operation. <br /> <br />That the Applicant has indicated that the methane gas extracted from the landfill <br />during the test demonstration will not impact the flow of gas necessary for the <br />power supply to Waltek, Inc. <br /> <br />That the Applicant has indicated that the noise factor associated with the operational <br />characteristics of the landfill gas/fuel cell system will be lower than the noise level <br />of the existing blowers located at the site as part of the groundwater treatment <br />facility. <br /> <br />That the Applicant has indicated that the odor factor will be less than current <br />existing odors at the Site for the following reasons: ~ <br /> <br />the demonstration project will utilize the landfill gas flow prior to the <br />existing flaring process; and <br /> <br />b) <br /> <br />the gas will be introduced into a clean-up process system prior to <br />introduction into the fuel cell. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.