My WebLink
|
Help
|
About
|
Sign Out
Home
Resolution - #94-04-077 - 04/26/1994
Ramsey
>
Public
>
Resolutions
>
1994
>
Resolution - #94-04-077 - 04/26/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 10:57:36 AM
Creation date
8/13/2024 3:42:12 PM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Resolutions
Resolution or Ordinance Number
#94-04-077
Document Date
04/26/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. <br /> <br />No mining operation shall be conducted closer than 30 feet to the right of way line of any <br />existing or platted street, road or right of way. <br /> <br />11. <br /> <br />Prior to commencing any mining operations, a cash escrow or letter of credit approved as <br />to form by the City in the amount of Seven Thousand Five Hundred Dollars ($7,500.00) <br />shall be deposited with the City. This financial guarantee may be used by the City to pay <br />for the cost and expense of repairing any public right of ways due to the mining operation, <br />pay for any cost associated in administering the requirements of this Chapter of the City <br />Code, and to pay for any restoration of the worksite not properly restored upon <br />completion. <br /> <br />The Permit Holder shall implement sediment and erosion control practices. No mining <br />activity shall occur within twenty-five (25) feet of a property line unless silt fence is placed <br />along the property line to prevent sediment from washing onto the adjoining property. Any <br />erosion which causes gullies of greater than one (1) foot within twenty-five (25) feet of a <br />property line shall be regraded within forty-eight (48) hours of the precipitation event that <br />caused the erosion. <br /> <br />13. <br /> <br />Stockpiles of mined materials and/or topsoil shall not exceed 900 cubic yards in total nor <br />six (6) feet in height. <br /> <br />14. <br /> <br />The permit holder shall file with the City a liability insurance policy or certificate of such <br />insurance acceptable to the City and issued by an insurance company authorized to do <br />business in the State of Minnesota. <br /> <br />a. The policy shall insure the permit holder for the sum of at least $300,000 for injury to <br /> one person and $500,000 for one accident, and at least $1,100,000 property damage. <br /> <br />Said policy shall be for the full period of the permit and shall provide for the giving of <br />10 days prior notice to the City by registered mail of termination, cancellation or <br />amendment of the policy. <br /> <br />Co <br /> <br />In the event said policy is terminated for any reason, the permit shall be automatically <br />suspended upon the day the policy terminates unless a new policy complying with this <br />item is obtained and filed with the City prior to the termination of the policy in fome. <br /> <br />15. <br /> <br />The maximum noise level at the perimeter of the worksite shall be within the limits set by <br />the Minnesota Pollution Control Agency and the Environmental Protection Agency of the <br />United States. <br /> <br />16. <br /> <br />All mining operations shall be conducted in accordance with the grading plan dated received <br />by the City on March 15, 1994. No more than one (1) acre of disturbed area shall be <br />permitted at any time. Continuation of mining shall require finished grade areas to be <br />restored with six (6) inches of topsoil, seed and disc anchored mulch. <br /> <br />17. <br /> <br />All costs incurred by the City in executing and administering this permit shall be the <br />responsibility of the permit holder. The permit holder shall maintain a minimum Five <br />Hundred Dollar ($500.00) balance in an escrow account with the City. This escrow shall <br />be used to reimburse the City for expenses incurred in the administration of this permit. At <br />the time the mining operation and site restoration are completed to the satisfaction of the <br />City, the balance of the escrow shall be returned to the Permit Holder. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.