My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 05/16/2006
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2000 - 2009
>
2006
>
Minutes - Public Works Committee - 05/16/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:00:22 PM
Creation date
6/30/2006 12:19:15 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
05/16/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is being created, and to treat it prior to its entrance into the wetland. The intent of the Wetland <br />Conservation Act and the WMO is to protect those areas and make them as pristine as possible. <br /> <br />Councilmember Pearson suggested the possibility of Mr. Rowe creating his own retention pond. <br /> <br />Mr. Rowe questioned where he would be able to locate a pond. He questioned the purpose of the <br />stormwater utility fees. <br /> <br />Chairperson Elvig noted the following issues. <br /> · Additional drainage due to the expansion on Mr. Rowe's property cannot mn to the <br /> neighbor's property unless there is an agreement in place. <br /> · If the stormwater is draining to a wetland the DNR will require that it be treated prior to <br /> entering that wetland. <br /> <br />Public Works Director Olson explained there are credits available for ponding and water <br />treatment that would reduce the stormwater treatment fee. Depending on the size there is the <br />potential of a 50% reduction. <br /> <br />Mr. Rowe inquired if there is anything in relation to the agricultural aspect of this land that could <br />change anything with these fees. <br /> <br />Public Works Director Olson replied not from a stormwater utility perspective. <br /> <br />Chairperson Elvig noted this site includes a lot of rooftops and impervious surface, as opposed to <br />a field, and he does not know that he would view the site as agricultural. <br /> <br />Public Works Director Olson advised this issue is open to the discussion of the Committee. Staff <br />wanted to present the Committee with the facts and inform them of how other businesses in the <br />City are treated. Staff's recommendation is to deny the appeal and that the property be billed at <br />the new rate of $2,953.69/qtr. He noted in 2000 using the 1997 aerial photographs the <br />impervious area was calculated at 384,000 square feet, which is roughly a little over 8 acres. <br />Now, based on the aerial photographs the impervious surface has increased to 746,000 square <br />feet, which is 17 total acres of impervious area. That is a dramatic increase to what was <br />originally anticipated. <br /> <br />Mr. Rowe questioned what is classified as impervious surface. <br /> <br />Public Works Director Olson replied Class 5, concrete and rooftops are classified as impervious <br />surface. <br /> <br />Mr. Rowe stated water will filter through Class 5 more than through rooftops or a blacktop <br />surface. <br /> <br />Chairperson Elvig noted part of the problem is that Mr. Rowe no longer owns land that he <br />previously owned, which helped to mitigate some of the water drainage. So proportionately <br />there is now a larger portion of the land that is impervious surface. <br /> <br />Public Works Committee / May 16, 2006 <br /> Page 9 of 16 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.