Laserfiche WebLink
<br />tQSe.lft 2 <br /> <br />AWARD BIDS FOR DIVISIONS B & C <br />OF 2006 STREET MAINTENANCE PROGRAM <br />By Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />Bids were awarded for Division A of the 2006 Street Maintenance Program on April 28, <br />2006. This work involved crack sealing and sealcoating on 5.34 miles of City streets <br />which has now been completed. Bids for Divisions B & C were postponed to allow time <br />for the design of storm sewer improvements which were found to be necessary on several <br />of the streets which were scheduled for bituminous overlay work. Division B includes <br />bituminous overlays on 11.7 miles of City streets. Division C was added to the contract <br />because it consists of street and trail paving which is of a similar nature to the Division B <br />work. The projects included in Division C. The Division C projects include (a) IP #06- <br />12, the grading and paving of 160th Lane; (b) IP #05-24 the S1. Francis Boulevard <br />frontage road paving; and (c) IP #05-30 the T.H. #47 Trail completion project north to <br />Elmcrest Park. <br /> <br />Bids are to be opened on Tuesday July II th and the results will be presented at the <br />meeting. <br /> <br />Recommendation: <br /> <br />To be presented at the meeting. <br /> <br />Action: <br /> <br />To be presented at the meeting. <br /> <br />Reviewed By: <br /> <br />Steven Jankowski, City Engineer <br />Brian E. Olson, P.E., Assistant Director of Public Works <br />Dean Kapler, Fire Chiefi'Director of Public Works <br />Grant Riemer, Public Works Supervisor <br />Diana Lund, Finance Officer <br /> <br />CC: 07/11/2006 <br /> <br />-93- <br />