Laserfiche WebLink
DocuSign Envelope ID:2C36256F-94DE-4874-8COF-3A4C509DAAD2 <br /> MnDOT Contract No.: 1052605 <br /> 1.4. Plans,Specifications,and Special Provisions. State-approved County plans, specifications, and special <br /> provisions designated by the County as SP 002-596-026 and by the City and the State as SP 0202-116 <br /> (TH 10=003) are on file in the office of the County's Engineer and incorporated into this Agreement by <br /> reference (Project Plans). <br /> 1.5. Duties of the County. The County will perform all of its duties and obligations in MnDOT Contract 1052131, <br /> which is incorporated herein by reference, in the solicitation, letting, award, and administration of the <br /> construction of the Project. <br /> 1.6. Exhibits. Preliminary Schedule "I" is attached and incorporated into this Agreement. Exhibit A—Signing <br /> Ownership and Maintenance, Exhibit 6—Drainage Ownership and Maintenance, Exhibit C—Wall <br /> Maintenance, and Exhibit D— Lighting Maintenance are on file in the office of the State's Cooperative <br /> Agreements Engineer at Saint Paul and incorporated into this Agreement by reference. <br /> 2. Right-of-Way Use <br /> 2.1. Limited Right to Occupy. The State grants to the County and the City (and their contractors and <br /> consultants)the right to occupy Trunk Highway Right-of-Way as necessary to perform the work described <br /> in the Project Plans.This right is limited to the purpose of constructing the Project and administering such <br /> construction and may be revoked by the State at any time, with or without cause. Cause for revoking this <br /> right of occupancy includes, but is not limited to, breaching the terms of this or any other agreement <br /> (relevant to this Project)with the State,failing to provide adequate traffic control or other safety <br /> measures,failing to perform the construction properly and in a timely manner, and failing to observe <br /> applicable environmental laws or terms of applicable permits.The State will have no liability to the County <br /> or the City (or their contractors or consultants)for revoking this right of occupancy. <br /> 2.2. State Access;Suspension of Work;Remedial Measures. The State's District Engineer or assigned <br /> representative retains the right to enter and inspect the Trunk Highway Right-of-Way(including the <br /> construction being performed on such right-of-way) at any time and without notice to the County or the <br /> City or their contractors. If the State determines (in its sole discretion)that the construction is not being <br /> performed in a proper or timely manner, or that environmental laws (or the terms of permits) are not <br /> being complied with, or that traffic control or other necessary safety measures are not being properly <br /> implemented,then the State may notify and require the County and the City (and their contractors and <br /> consultants)to suspend their operations until the County and the City (and their contractors and <br /> consultants)take all necessary actions to rectify the situation to the satisfaction of the State.The State will <br /> have no liability to the County or the City (or their contractors or consultants) for exercising or failing to <br /> exercise its rights under this provision. <br /> 2.3. Traffic Control; Worker Safety. While the County and the City (and their contractors and consultants) are <br /> occupying the State's Right-of-Way,they must comply with the approved traffic control plan, and with <br /> applicable provisions of the Work Zone Field Handbook <br /> (http://www.dot.state.mn.us/trafficeng/workzone/index.html).All County, City,contractor,and consultant <br /> personnel occupying the State's Right-of-Way must be provided with required reflective clothing and hats. <br /> 2.4. State Ownership of Improvements. The State will retain ownership of its Trunk Highway Right-of-Way, <br /> including any improvements made to such right-of-way under this Agreement, unless otherwise noted. <br /> The warranties and guarantees made by the County's contractor with respect to such improvements (if <br /> any) will flow to the State.The County will assist the State, as necessary,to enforce such warranties and <br /> guarantees, and to obtain recovery from the County's consultants and contractor(including its sureties)for <br /> non-performance of contract work,for design errors and omissions, and for defects in materials and <br /> workmanship. Upon request of the State,the County will undertake such actions as are reasonably <br /> necessary to transfer or assign contract rights to the State and to permit subrogation by the State with <br /> respect to claims against the County's consultants and contractors. <br /> -3- <br /> Payable Standard <br />