My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/10/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 09/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:33:04 AM
Creation date
9/11/2024 11:55:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/10/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2C36256F-94DE-4874-8COF-3A4C509DAAD2 <br /> MnDOT Contract No.: 1052605 <br /> 2.5. Utility Relocation. The State authorizes the County to issue Notices and Orders for utility relocation in <br /> accordance with Minnesota Statutes§161.45 and Minnesota Rules Part 8810.3100 through 8810.3600. <br /> 3. Contract Award and Construction <br /> 3.1. Bids and Award. The County will receive bids and award a construction contract to the lowest responsible <br /> bidder(or best value proposer),subject to concurrence by the State in that award, according to the Project <br /> Plans.The contract construction will be performed according to the Project Plans. <br /> 3.2. Bid Documents Furnished by the County. The County will,within seven days of opening bids for the <br /> construction contract, submit to the State's District Engineer a copy of the low bid and an abstract of all <br /> bids together with the County's request for concurrence by the State in the award of the construction <br /> contract.The County will not award the construction contract until the State advises the County in writing <br /> of its concurrence. <br /> 3.3. Rejection of Bids. The County may reject and the State may require the County to reject any or all bids for <br /> the construction contract.The party rejecting or requiring the rejection of bids must provide the other <br /> party written notice of that rejection or requirement for rejection no later than 30 days after opening bids. <br /> Upon the rejection of all bids, a party may request, in writing, that the bidding process be repeated. Upon <br /> the other party's written approval of such request,the County will repeat the bidding process in a <br /> reasonable period of time, without cost or expense to the State. <br /> 3.4. Contract Terms. The County's contract with its construction contractor(s) must include the following <br /> terms: <br /> A. A clause making the State of Minnesota, acting through its Commissioner of Transportation, an <br /> intended third-party beneficiary of the contract with respect to the portion of work performed on the <br /> State's Right-of-Way; and <br /> B. A clause requiring the State to be named as an additional insured on any insurance coverage which the <br /> contractor is required to provide; and <br /> C. A clause stating that any warranties provided by the contractor,for the work performed on the trunk <br /> highway, will flow to, and be enforceable by,the State as the owner of such improvements. <br /> 3.5. Direction,Supervision,and Inspection of Construction <br /> A. The contract construction will be under the direction of the County and under the supervision of a <br /> registered professional engineer; however, the State will perform construction inspection, materials <br /> inspection, and surveys and staking for all construction items except for the City water main and <br /> sanitary sewer construction.The City will be responsible for the construction engineering for the City <br /> water main and sanitary sewer construction including, but not limited to, construction inspection and <br /> materials inspection.The State will provide surveys and staking for the City water main and sanitary <br /> sewer construction.The County will give the State Aid Agreements Engineer at Roseville five days' <br /> notice of its intention to start the contract construction. <br /> B. Responsibility for the control of materials for the contract construction will be on the County and its <br /> contractor and will be carried out according to Specifications 1601 through and including 1609 in the <br /> State's current Standard Specifications for Construction. <br /> 3.6. Contaminated Soils and Groundwater within the State's Cost Participation Limits <br /> A. 24 Hour Notification. The County will notify the State District Engineer's authorized representative a <br /> minimum of 24 hours prior to the contractor beginning the excavation and removal of any <br /> contaminated soils that have been identified within the Project limits. <br /> -4- <br /> Payable Standard <br />
The URL can be used to link to this page
Your browser does not support the video tag.