The bid of Northwest of Shakopee,Minnesota, in the amount of$1,009,971.93 for the total bid for said <br /> improvements in accordance with the approved plans and specifications and advertisement for bids, is the lowest <br /> responsible bidder. <br /> Adding indirect costs in the amount of 23-percent,brings the total project costs to $1,242,265.47. The high level <br /> 2024—2033 CIP estimated total project costs of$1,314,878 for these improvements. <br /> The low bid is 3-percent greater than the engineer's estimate,primarily due to higher than anticipated bituminous <br /> material costs. Bidding was competitive, with all bids being within 7-percent of the low bid. <br /> Funding source breakdown: <br /> Funding Source Construction Costs Indirect Costs Total Costs <br /> MSA Funds $521,289.83 $119,896.66 $6411186.48 <br /> i <br /> Water Utility Funds $48802.11 $112,396.88 $6011078.99 <br /> Project Totals $1,0099971.93 $2329293.54 $192429265.47 <br /> Bolton and Menk submitted a proposal for construction staking and as-built survey of the proposed <br /> improvements for a total not-to-exceed amount of$15,426.00. The construction staking and as-built survey are <br /> included in the indirect project costs. <br /> City Staff proposes to administer and inspect construction. Plans and specifications were prepared in-house as <br /> part of Staff s normal duties. <br /> Recommendation: <br /> Staff recommends Alternative#1. <br /> Outcome/Action: <br /> Action: <br /> Motion to adopt Resolution#24-076 accepting bids and awarding a contract for MSA Alpine Drive <br /> Reconstruction, Improvement Project#24-11,to Northwest for the total bid in the amount of$1,009,971.93. <br /> Attachments <br /> Res 24-076 <br /> 24-11 Street Summary <br /> 24-11 Final Plans <br /> 24-11 Staking Proposal <br /> Form Review <br /> Inbox Reviewed By Date <br /> Bruce Westby Bruce Westby 03/21/2024 02:51 PM <br /> Brian Hagen Brian Hagen 03/21/2024 03:5 8 PM <br /> Form Started By:Joe Feriancek Started On:03/18/2024 08:54 AM <br /> Final Approval Date:03/21/2024 <br />