My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/24/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 09/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:34:17 AM
Creation date
10/8/2024 11:30:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/24/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Purpose of Change Order: <br />I. Due to the difficulty in completing the HDD pipe across Bunker Lake Blvd, the Contractor requested and received <br />permission to install the 20" watermain crossing via open cut methods. Anoka Conty required this work to be done on <br />a Saturday since it involved a complete closure of their highway. The City agreed to use Time and Materials (T&M) <br />for the change order. Attached is a detailed summary from Northdale outlining the steps they took to complete the <br />work and account for the hours and materials used. The total pipe related work is approximatley $31,000 and the <br />remainder is for other subcontractors such as paving and traffic control. As a side note, the City contract was reduced <br />approxaimtely $23,000 in pipe installation costs due to not doing the direction drilling method. <br />2. Due to changing site conditions (i.e, unknown concrete under road) the Contractor has to rent additional <br />equipment to remove 5-foot thick concrete to install the 20-inch watermain on 143rd Ave. <br />Basis of Cost: ❑ Actual 1E1 Estimated <br />Attachments (list supporting documents) <br />• Northdale Const. Co. Inc. Invoice dated 08/28/24 <br />Contract Status <br />Original Contract <br />Net Change Prior C.o.'s I <br />Change this C.C. <br />Revised Contract <br />o 2 <br />Recommended for Approval: Short Elliott Hendrickson Inc. by <br />Time <br />Cost <br />$6,671,414.00 <br />$271, 725. 31 <br />$124,765.45 <br />$7, 067, 904.76 <br />Dave Hutton, PE (Lic. MN, WI, ND) <br />Agre �-t� Contractor: Approved for owner: <br />r <br />BY Northdale Construction <br />q7/62 (c;0, t-( <br />TITLE <br />BY City of Ramsey <br />TITLE <br />Distribution Contractor 2 Owner 7 Project Representative I SEH Office i <br />x:lptlrlramsy117449817-coast-svcs171-mgmt\50-chg-order\co31cpn 21-08 ramsey change order #3.docx <br />Engineers I Architects I Planners I Scientists <br />Short Elliott Hendrickson Inc., 10650 Red Circle Drive, Suite 500, Minnetonka, MN 55343-9229 <br />952,912.2600 I 800.734.6757 1888.908.8166 fax I sehinc.com <br />SEH is 100% employee -owned I Affirmative Action --Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.