My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/24/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 09/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:34:17 AM
Creation date
10/8/2024 11:30:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/24/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />NORTHDALE CONST. CO. INC. <br />9760 71st St NE -Albertville, MN 55301 <br />Office: 763-428-4868 <br />Fax: 763-428-4997 <br />BILLED TO: <br />Short Elliott Hendrickson, Inc. <br />Attn: David Hutton, PE <br />10650 Red Circle Drive, Suite 500 <br />Minnetonka, MN 55343 <br />INVOICE DATE: <br />INVOICE# <br />OUR JOB # <br />PLAN SHEET # <br />PLAN STATION # <br />JOB NAME: <br />LOCATION: <br />HOUSE # / STREET: <br />DATE OF WORK: <br />8/28/2024 <br />202403-CO h <br />2024-03 <br />35 REVISED <br />137+18 to 130+21 <br />Trunk WM Improvement <br />Ramsey <br />Bunker Lk / Azurite St <br />8/23/24 & 8/24/24 <br />DESCRIPTION OF WORK: <br />Anoka County only allowed the work in the intersection of Bunker Lake Blvd and 143rd Ave to be completed on Saturday, <br />August 24th. In order to meet the time constraints, Northdale began setting the stage Friday afternoon. The guys worked <br />on getting the 16" x 20" reducer and 20" 11 1/4 degree bend on 20" SJ WM. We bolted the reducer to 4' of 16" DIP and <br />added 15' of 20" SJ WM, The 11 1/4 degree was bolted on a stick of 20" SJ WM. We orginally thought about using the <br />directional drilled pipe for this work but after looking it over and the time constraits we opted for SJ and will use the <br />directional drilled pipe in another location. <br />On August 24th, Warning Lites set up all road closures starting at 5:30 am. Northdale's crew came in at 6:00 am to start <br />moving boxes / sheeting closer to the intersection. We removed the bituminous pavement and hauled it to Sauters <br />instead of stockpiling. We removed the Class 5 and stockpiled it closer so we weren't wasting time travelling to the bone <br />yard to get material. We used our Ford Dump Truck to haul the rubble and Class 5. Reiner Contracting also came in at <br />6:00 am to cut the pavement on Bunker Lk Blvd. He needed to make (3) passes. Northdale started the removal as soon <br />as he was done cutting. Once everything was removed, we dug down to find the water main and set the box / sheeting for <br />the wet tap. Fobbe Contracting arrived around 9:45 am with two workers to perform the 16" wet tap which took <br />approximately 3 hours that ended around 1:00 pm.They pressure tested the valve / seal also. <br />The material was very sandy, almost like sugar sand, which required us to use all the metal sheeting that we had. It also <br />required some fiber boards to protect the roadway from collapsing and keep the sand from running back into the trench <br />box so we could safely lay the pipe. When Fobbe completed the wet tap, we installed the first section of pipe that included <br />4 ft of 16" DIP along with a 16x20 reducer and 15 ft of 20" SJ WM. We then dug out for the next pass and shifted all of the <br />sheets. The next pipe had an 11 1/4 degree bend bolted on. We then would drag the 2nd box with us the remainder of the <br />time and piggy backed the metal sheets. This was a slow process but was necessary to save the road from undermining <br />and to keep the sand from coming back in. Next, we dug and installed the 20" WM underneath the utilities in the radius of <br />the intersection which was also time consuming. It didn't make sense to stop short or underneath the (4) utilites. We <br />would have needed to go back into the radius if we didn't. Once completed, we started to backfill and remove the sheeting <br />/ boxes. We had to work our way back to pull the first box that was installed for the wet tap. We had to be careful not to <br />damage the existing blacktop or saw cuts. We were at the maximum width that the paver could blacktop back without <br />making a second pass. North Oaks Paving arrived around 4:00 pm and didn't start paving until around 8:30 pm. The <br />reason they were there at 4pm was because the plant wouldn't supply mix after 4pm so they had (4) trucks full sitting <br />there until we were done installing the watermain. Because the depth of the bit replacement and heat, they had to pave <br />the area in (3) 2" lifts. They ended their work around 1:00 am. While the paving was taking place, Northdale swept the <br />intersection with our sweeper to clean all the debris from the road surface. Warning Lites pulled the detour signage <br />around 1:00 am when the paving was completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.