Laserfiche WebLink
utilizing filtration practices as allowed by LRRWMO stormwater standards, or off -site in a regional infiltration <br />basin located outside the East DWSMA. <br />City staff has discussed various aspects of this project with LRRWMO and MPCA staff, including potential <br />wetland impacts, options for meeting volume retention requirements, and how the timing of this project can be <br />coordinated with the Lightbridge Academy development construction to ensure adequate stormwater runoff <br />treatment can be provided during construction of both projects. <br />Staff has coordinated the construction schedule of the City's stormwater pond improvements project with the <br />Lightbridge Academy development construction schedule to address concerns raised by the LRRWMO. <br />Lightbridge Academy's engineer prepared and submitted a phased construction plan with their LRRWMO <br />permit application, which has been approved. Lightbridge Academy is constructing their building first with <br />minimal disturbance to the rest of the site while the Rivers Bend Regional Stormwater Improvements project is <br />designed and bid. Lightbridge Academy would then complete site improvements including impervious surface <br />improvements during construction of the Rivers Bend Regional Stormwater Management Improvements this <br />Fall. <br />Bolton & Menk also performed a wetland delineation to identify the limits of the existing wetland to avoid <br />impacts. This report was completed and is submitted to the LRRWMO for concurrence and approval, which is <br />currently scheduled to occur on September 19, 2024, along with approval of the LRRWMO erosion <br />control/stormwater permit. <br />On August 12, 2024, the plans and specifications prepared by Bolton & Menk, Inc. were approved and <br />advertisements for bids were authorized for City Improvement Project #25-01, Rivers Bend Regional <br />Stormwater Improvements. <br />Bids were advertised in QuestCDN, the electronic bid platform utilized by the City of Ramsey for all <br />improvement projects, and in the Anoka Union Herald on Friday, August 16th, and on Friday, August 23rd, <br />2024. Five (5) bids were received, opened and tabulated on September 6, 2024, and the following bids were <br />found to comply with the approved plans and specifications and advertisement for bids. <br />Contractor <br />Douglas -Kerr Underground, LLC <br />Rachel Contracting, LLC <br />Peterson Companies <br />U.S. SiteWork, Inc. $ <br />New Look Contracting, Inc. <br />Engineer 's Estimate <br />Base Bid klternate Bid <br />$1,009,679.76 <br />$1,254,337.00 <br />$1,546,189.50 <br />$1,169,370.00 <br />$0.01 <br />$16,900.00 <br />Total Bid <br />$899,653.31 <br />$1,016,448.00 <br />$0.00 $1,009,679.76 <br />$22,160.00 <br />$15,000.00 <br />$1,276,497.00 <br />$1,561,189.50 <br />$95, 000.00 $1, 264, 3 70.00 <br />Douglas -Kerr Underground, LLC of Mora, Minnesota, who submitted a total bid in the amount of $899,653.31 <br />for construction of said improvements in accordance with the approved plans and specifications and <br />advertisement for bids, is the lowest responsible bidder Attached is a Bid Results and Recommendation memo <br />from Bolton & Menk, Inc., which states if the City of Ramsey decides to award the project to the low bidder, <br />we recommend awarding the contract to Douglas -Kerr Underground, L.L.C. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />Attached is a proposal from Bolton & Menk, Inc. for construction services in the not -to -exceed amount of <br />$15,240. <br />